Notices · Solicitation
WHC Marshall Hall Cubicle (Brand Name Steelcase Montage)
Closed. Responses were due September 15, 2026, 2:00 PM ET.
| Solicitation number | W9124726TQ500 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC FDO FT BRAGG |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 337214 Office Furniture (Except Wood) Manufacturing SBA size standard: 1,100 employees |
| Product or service code | 7110 Office Furniture |
| Place of performance | 28394 |
| Posted | August 31, 2026 |
| Response due | September 15, 2026, 2:00 PM ET |
Who holds the work now
Largest current award in NAICS 337214 at the Department of the Army, by dollars obligated: AFFORDABLE INTERIOR SYSTEMS, INC., current end date September 11, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W9124726TQ500 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Mission and Installation Contracting Command Center Fort Bragg MICC Center FB has a continuing requirement from the US Army Reserve Command USARC United States Army Western Hemisphere Command USAWHC Headquarters to provide customized service solutions to reconfigure existing office cubicles. This has been an ongoing requirement for USAWHC and USARC over the last few years. The contractor must therefore build on existing cubical configurations. All components procured under the anticipated contract shall therefore match the existing Steelcase Brand Montage Configuration Solutions currently in place for USAWHC and USARC. The primary objective of this requirement is to provide Steelcase brand name, Montage Style cubicle components and office cubicle installation reconfiguration services for the HQ USAWHC and USARC. Specifically, this primary objective includes the following tasks. The Contractor shall have the capability to procure Steelcase brand cubical components from the Montage Catalogue Technical Exhibit 4. Contractor shall assume responsibility for the delivery, protection, documentation and storage of these cubical components prior to installation. The Contractor shall assemble and install all procured office cubical components IAW the manufacturers instructions/warranty provisions and specifications given by the customer. Contractor shall furnish qualified personnel with the tools, materials and safety equipment required to perform the required assemblies. Please provide Pricing Catalogue or Pricing Guide specific to Steelcase Montague with submittal.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | August 31, 2026 | September 15, 2026, 2:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.