B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback

Closed. Responses were due November 12, 2026, 1:00 PM ET.

Solicitation numberW9126G27R1CSY
Notice typeSources Sought
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W076 ENDIST FT WORTH
Set-asideNone (full and open competition)
NAICS237130 Power and Communication Line and Related Structures Construction
SBA size standard: $45M average annual receipts
Product or service codeY1NZ Construction of Other Utilities
Place of performanceDyess AFB, TX, USA
PostedOctober 28, 2026
Response dueNovember 12, 2026, 1:00 PM ET

Who holds the work now

Largest current award in NAICS 237130 at the Department of the Army, by dollars obligated: CCI FACILITY CONTRACTORS, LLC, current end date November 5, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W9126G27R1CSY in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

SUBJECT: Sources Sought Notice/RFI – B-21 Utilities & Site Improvements, Communications and Electrical Infrastructure, Dyess AFB, Texas DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice. PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. PROJECT DESCRIPTION This project adds electrical distribution infrastructure and fiber optic communications infrastructure to the existing base networks, supporting multiple new projects associated with the bed-down of the B-21 weapons system at Dyess Air Force Base with an estimated Construction Cost Limitation of $28,550,000. The communications component of this project includes the addition of single mode fiber optic cable in underground concrete encased duct, together with telephone system expansion. The electrical distribution component includes power cabling, also in underground concrete encased duct, as well as pole mounted power conductors and all associated transformers & equipment. Primary Underground Distribution includes new switchgear, cabling, duct banks, manholes & other associated appurtenances. Facilities to be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems. INSTRUCTIONS TO INDUSTRY Review Attached Project Information Packet (PIP): Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference. Submit Responses via Microsoft Forms: To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link: Online Feedback Form: https://forms.osi.apps.mil/r/36mhctReuT Response Due Date: All electronic responses must be submitted via the online form no later than November 12, 2026, at 12:00 PM Central Time (CT). POINTS OF CONTACT Contract Specialist: Patricia Dickson, patricia.l.dickson@usace.army.mil, (817) 886-1095 Contracting Officer: Christopher R. Preston, II, Christopher.r.preston@usace.army.mil, (817) 940-2482

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtOctober 28, 2026November 12, 2026, 1:00 PM ET
Sources SoughtOctober 28, 2026November 12, 2026, 1:00 PM ET