Notices · Solicitation
Horizontal Construction MATOC
Closed. Responses were due September 24, 2026, 3:00 PM ET.
| Solicitation number | W9127826RA088 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W074 ENDIST MOBILE |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Z2JZ Repair or Alteration of Miscellaneous Buildings |
| Place of performance | 36602 |
| Posted | September 20, 2026 |
| Response due | September 24, 2026, 3:00 PM ET |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W9127826RA088 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Mobile District COE has a need for one MATOC for a full range of horizontal construction, renovation, repair, and some incidental design task orders for general construction primarily at 12 locations in AL, FL, GA, and MS. This project is a Best Value, two-phase design-build solicitation. A detailed project description and overall project performance requirements for this project will be included in the Request For Proposals (RFP) package. The solicitation criteria relies upon industry standards, where allowable, to afford the offeror a degree of design flexibility while meeting certain specific project requirements. The successful Contractor must design and construct complete and usable facilities, as described in the RFP documents. One solicitation will be issued covering both phases. Proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two, and an amendment will be issued to those selected offerors. Selection of offerors for involvement in Phase Two will be based on technical approach and performance capability. Detailed project design requirements will then be added by amendment to the solicitation at the start of the Phase Two stage of the Request For Proposals. A limited number of firms will be invited to participate in the second phase. Amendment 0001 is posted 21 September 2026.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | August 20, 2026 | September 21, 2026, 3:00 PM ET |
| Solicitation | September 20, 2026 | September 24, 2026, 3:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.