Allatoona Lake Dam - Eight (8) Sluice Gate

Closed. Responses were due October 12, 2026, 2:00 PM ET.

Solicitation numberW9127827RA006
Notice typeSources Sought
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W074 ENDIST MOBILE
Set-asideNot listed
NAICS332312 Fabricated Structural Metal Manufacturing
SBA size standard: 500 employees
Product or service code9640 Iron and Steel Primary and Semifinished Products
Place of performanceNot listed
PostedSeptember 8, 2026
Response dueOctober 12, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 332312 at the Department of the Army, by dollars obligated: OCCI INC, current end date July 24, 2029. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W9127827RA006 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This is a Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm-Fixed Price (FFP) Single Award Task Order Contract (SATOC) to fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The delivery location is Allatoona Dam, Allatoona Dam Road SE, Cartersville, GA 30121. The anticipated delivery date/timeframe is Summer 2027. The Statement of Work includes the following: The U.S. Army Corps of Engineers (USACE), Mobile District, requires a fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The contractor will be responsible for casting, machining, testing, and delivering new gates that match the existing gate dimensions of five-foot and eight-inches wide by ten-foot and zero inches high (as-builts attached for reference only). Due to the intricate structural ribbing and variable cross-sectional thicknesses of the original design, the new gates require highly complex casting to ensure proper form, fit, and function within the dams existing embedded infrastructure. The contractor will then be required to deliver to the Government after acceptance.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtSeptember 8, 2026October 12, 2026, 2:00 PM ET