Excitation System Replacement, Beaver Dam, White River Basin, Carroll County, Arkansas
Open. Responses are due in 56 days, on January 22, 2027, 2:00 PM ET.
| Solicitation number | W9127S27RA014 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W076 ENDIST LITTLE ROCK |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 335312 Motor and Generator Manufacturing SBA size standard: 1,250 employees |
| Product or service code | Z2MD Repair or Alteration of Epg Facilities - Hydro |
| Place of performance | 72631 |
| Posted | November 24, 2026 |
| Response due | January 22, 2027, 2:00 PM ET |
Who holds the work now
Largest current award in NAICS 335312 at the Department of the Army, by dollars obligated: CUMMINS POWER GENERATION INC., current end date July 31, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W9127S27RA014 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Solicitation Notice: Excitation System Replacement, Beaver Power Plant, White River Basin, Carroll County, Arkansas for U.S. Army Corp of Engineers (USACE) Little Rock District (SWL). W9127S27RA014, Excitation System Replacement, Beaver Power Plant, is advertised as a competitive total Small Business Set Aside under the North American Industrial Classification System (NAICS) Code 335312 - Motor and Generator Manufacturing. The Small Business Size Standard is set at 1,250 employees. This solicitation will be issued utilizing FAR Overhaul Part 15 as a Request for Proposals (RFP). Proposals will be evaluated via the Best Value - Trade Off method and will result in a firm fixed-price construction contract. The Magnitude of Construction is between $1M and $5M. Design, remove, install, and test two digital static excitation systems, including power potential transformers for each system. Work shall be complete within 515 calendar days. Amendments to the solicitation will be issued via PIEE/GPE. It is each offerors responsibility to download the solicitation and monitor the sites for updates. Offerors must be registered with the System for Award Management (SAM) in order to submit a proposal in response to this solicitation. Contractors may register for SAM at no cost to them at the following website: www.sam.gov. This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit FCI or CUI during performance of the contract. In accordance with 252.204-7021 Compliance with the Cybersecurity Maturity Model Certification Level Requirements, contractors shall submit the CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract. The Contract Specialist for this solicitation will be Shelby Pyle. All questions/comments should be forwarded in writing to shelby.m.pyle@usace.army.mil. Review the attached solicitation and attachments 0001-0008.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | October 6, 2026 | October 21, 2026, 2:00 PM ET |
| Solicitation | November 24, 2026 | January 22, 2027, 2:00 PM ET |