Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Sources Sought

Sources Sought Notice - Broken Bow Powerhouse Roof Replacement

Closed. Responses were due January 9, 2026, 3:00 AM ET.

Solicitation numberW912BV26JEL1
Notice typeSources Sought
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W076 ENDIST TULSA
Set-asideNot listed
NAICS238160 Roofing Contractors
SBA size standard: $19M average annual receipts
Product or service code5650 Roofing and Siding Materials
Place of performance74728
PostedDecember 9, 2025
Response dueJanuary 9, 2026, 3:00 AM ET

Who holds the work now

Largest current award in NAICS 238160 at the Department of the Army, by dollars obligated: PACIFIC TECH CONSTRUCTION INC, current end date March 31, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912BV26JEL1 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The U.S. Army Corps of Engineers (USACE) - Tulsa District (SWT) is conducting market research for an anticipated Design-Build (D-B) contract for roofing replacement with all design and construction work being performed by the Contractor. The Contractor shall provide all investigation, verification of site conditions and dimensions, design, research, travel, plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work required. See attached for details.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtDecember 9, 2025January 9, 2026, 3:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.