Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Electrical Substation Maintenance and Repairs

Closed. Responses were due November 23, 2026, 10:00 AM ET.

Solicitation numberW912C327QA001
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W6QM MICC-FORT BUCHANAN (RC)
Set-asideSmall Business Set Aside - Total (SBA)
NAICS238210 Electrical Contractors and Other Wiring Installation Contractors
SBA size standard: $19M average annual receipts
Product or service codeJ061 Maint/Repair/Rebuild of Equipment- Electric Wire and Power Distribution Equipment
Place of performanceFort Buchanan, PR 00934, USA
PostedNovember 19, 2026
Response dueNovember 23, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 238210 at the Department of the Army, by dollars obligated: M. C. DEAN, INC., current end date January 27, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912C327QA001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

THIS A PRE-SOLICITATION NOTICE. The Mission & Installation Contracting Command (MICC)-Fort Buchanan has a Request for Quote (RFQ) No. W912C327QA001 for Electrical Substation Maintenance and Repairs. A Firm Fixed Price contract will be awarded for this requirement. The RFQ will be issued on or about 30 November 2026. The RFQ will be issued as 100% set-aside small business on a competitive basis. All responsible sources are invited to submit a quote under this solicitation. The North American Industry Classification System (NAICS) code applicable to this requirement is 238210, Electrical Contractors and Other Wiring Installation Contractors. The size standard is $19 Million. MICC has a requirement for Electrical Substation Maintenance and Repairs, including all necessary administrative functions, personnel, materials, tools, equipment, services, transportation, and insurance required to perform the services outlined in the PWS. The requirement supports Fort Buchanan’s electrical distribution systems serving military and civilian personnel, tenant commands, schools, housing areas, and associated organizations across the installation. Work includes annual preventive maintenance, electrical diagnostics, utility coordination with LUMA, vegetation control, unscheduled service response, and corrective repairs using Original Equipment Manufacturer (OEM) or approved parts. For any request for information on this requirement contact Eileen Rivera at eileen.z.riveradomenech.civ@army.mil and/or Felix Marrero at Felix.r.marrero2.civ@army.mil.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationNovember 8, 2026November 23, 2026, 10:00 AM ET
PresolicitationNovember 19, 2026November 23, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.