Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Water and Electrical Utility Lines, Minooka Park C Loop Campground at Wilson Lake, Kansas

Closed. Responses were due September 9, 2026, 2:00 PM ET.

Solicitation numberW912DQ26BA017
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W071 ENDIST KANSAS CITY
Set-asideHistorically Underutilized Business (HUBZone) Set-Aside (FAR 19.13) (HZC)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1NZ Construction of Other Utilities
Place of performance67626
PostedSeptember 8, 2026
Response dueSeptember 9, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DQ26BA017 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The Bid Opening attendance and abstract is posted. The solicitation is amended with amendment 0002 to update the bid submittal instructions. The Primary submittal of contractors bid is to PIEE, but email is also authorized for those that are not able to submit via PIEE. BIDs MUST BE RECEIVED BY DUE DATE AND TIME PER THE SOLICITATION. The solicitation is amended to revise two drawings. The U.S. Army Corps of Engineers (USACE), Kansas City District (NWK), has a need for construction services in support of the Minooka Park C Loop Campground Wilson Lake, Kansas. The contractor shall provide all plant, labor, equipment, and materials (except government-furnished materials) required to complete the installation of water and electrical utility lines. This work will provide individual campsite power and water connections along C-Loop in the Minooka Park Campground.

Attachments

SAM.gov lists 4 files with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationAugust 9, 2026September 9, 2026, 2:00 PM ET
SolicitationAugust 27, 2026September 9, 2026, 2:00 PM ET
SolicitationAugust 31, 2026September 9, 2026, 2:00 PM ET
SolicitationAugust 31, 2026September 9, 2026, 2:00 PM ET
SolicitationSeptember 7, 2026September 9, 2026, 2:00 PM ET
SolicitationSeptember 8, 2026September 9, 2026, 2:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.