Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Kansas City Levees UPRR Closure Structure

Closed. Responses were due April 23, 2026, 12:00 PM ET.

Solicitation numberW912DQ26RA035
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W071 ENDIST KANSAS CITY
Set-asideNot listed
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1LB Construction of Highways, Roads, Streets, Bridges, and Railways
Place of performance66105
PostedMarch 17, 2026
Response dueApril 23, 2026, 12:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DQ26RA035 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The Kansas City District, United States Army Corps of Engineers (USACE), has a need for the construction of four closure structures (two stoplog and two sandbag) located on both sides of two Union Pacific Railroad (UPRR)- owned bridges crossing the Armourdale (ARM; West side of the Kansas River) and Central Industrial District (CID; East side of the Kansas River) Levee Units. The south bridge (UPRR #3) contains two sets of railroad tracks: Mainline Track No. 1 and Mainline Track No. 2. The north bridge (MOPAC) contains two sets of railroad tracks: Track No. 3 and Track No. 202. Floodwalls are to be constructed to the north and the south of the closure structures and tie into existing floodwalls on the ARM side. Closure structures on the CID side connect to earthen levees. Stoplogs and all stoplog components need to be fabricated for the project, and once construction of the stoplog closure structures is complete, a test-fit of the stoplogs across Mainline Track No. 1 and Mainline Track No. 2 is required. To facilitate construction and test-fit of the stop logs, UPRR will require the approval of construction submittals, including a phasing plan, temporary shoring plans, and obtaining temporary track outages. Construction will require flagging operations for all activities within 25 feet of the track or if equipment has the potential to foul track. Stoplog storage structures to store all stoplog components also need to be provided on each levee unit.

Attachments

SAM.gov lists 1 file with this notice. Open it on SAM.gov, or ask Claude to read it.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationMarch 8, 2026April 23, 2026, 12:00 PM ET
SolicitationMarch 9, 2026April 23, 2026, 12:00 PM ET
SolicitationMarch 17, 2026April 23, 2026, 12:00 PM ET
Award NoticeAugust 23, 2026