Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

North East River Maintenance Dredging, Cecil County, MD

Closed. Responses were due June 30, 2026, 11:00 AM ET.

Solicitation numberW912DR26BA007
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SD ENDIST BALTIMORE
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeZ1KF Maintenance of Dredging Facilities
Place of performanceNot listed
PostedJune 14, 2026
Response dueJune 30, 2026, 11:00 AM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DR26BA007 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be approximately 120 calendar days from the Notice to Proceed.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtApril 29, 2026May 15, 2026, 11:00 AM ET
Sources SoughtMay 18, 2026May 26, 2026, 11:00 AM ET
PresolicitationJune 14, 2026June 30, 2026, 11:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.