Notices · Solicitation
CYBER NATIONAL MISSION FORCE (CNMF) CONSTRUCTION
Closed. Responses were due June 29, 2026, 3:00 PM ET.
| Solicitation number | W912DR26RA010 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W2SD ENDIST BALTIMORE |
| Set-aside | Not listed |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1JZ Construction of Miscellaneous Buildings |
| Place of performance | 20755 |
| Posted | June 23, 2026 |
| Response due | June 29, 2026, 3:00 PM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Department of the Army, by dollars obligated: WALSH - TURNER JV II, current end date April 7, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912DR26RA010 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Cyber National Mission Force - Mission Operations Facility (CNMF-MOF) project requirements focus on the design and construction of a State-of-the-Art Mission building within the Central Campus site at Ft. Meade, Maryland. The primary facility is approximately 750,000 gross square feet (GSF) in size and will accommodate approximately 2,400 people. The state-of-the-art facility shall allow for a variety of tenant occupancy functions and flexible size and configurations to conduct the mission, administrative, and support services. The project also includes the expansion of the multi-level East Campus Parking Structure 4 (ECPS 4) for 1,758 spaces of structured parking. The overall CNMF-MOF parking requirement is 85% of the MOF projected seat count and may be accommodated through the expansion of ECPS 4 and surface parking. All required utilities, connections, and secure telecommunication distribution systems shall be fully integrated into the facilities. The project also includes but is not limited to a pedestrian bridge connecting the CNMF-MOF to the East Campus Building 5 (ECB 5); relocation of the Construction Surveillance Technician (CST) trailers; on-site/off-site roadway improvements; storm water management facilities; site restorations, reforestation; existing on-site utilities improvements; installation of new utilities; demolition of an existing building; and life safety generation.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | May 25, 2026 | June 25, 2026, 3:00 PM ET |
| Solicitation | June 4, 2026 | June 25, 2026, 3:00 PM ET |
| Solicitation | June 23, 2026 | June 29, 2026, 3:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.