Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Upper Wicomico River Dredging Project, Wicomico County, MD

Closed. Responses were due October 21, 2026, 11:00 AM ET.

Solicitation numberW912DR27BA002
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SD ENDIST BALTIMORE
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeZ1KF Maintenance of Dredging Facilities
Place of performanceNot listed
PostedOctober 5, 2026
Response dueOctober 21, 2026, 11:00 AM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DR27BA002 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationOctober 5, 2026October 21, 2026, 11:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.