Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

Closed. Responses were due October 21, 2026, 2:00 PM ET.

Solicitation numberW912DS26RA032
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SD ENDIST NEW YORK
Set-asideNot listed
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1PZ Construction of Other Non-Building Facilities
Place of performancePort Monmouth, NJ, USA
PostedOctober 19, 2026
Response dueOctober 21, 2026, 2:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DS26RA032 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.

Attachments

SAM.gov lists 20 files with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationSeptember 16, 2026October 19, 2026, 2:00 PM ET
SolicitationSeptember 17, 2026October 19, 2026, 2:00 PM ET
SolicitationSeptember 17, 2026October 19, 2026, 2:00 PM ET
SolicitationOctober 1, 2026October 19, 2026, 2:00 PM ET
SolicitationOctober 18, 2026October 19, 2026, 2:00 PM ET
SolicitationOctober 18, 2026October 21, 2026, 2:00 PM ET
SolicitationOctober 19, 2026October 21, 2026, 2:00 PM ET
SolicitationOctober 19, 2026October 21, 2026, 2:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.