Notices · Solicitation
W912DY26RA063
Closed. Responses were due May 7, 2026, 11:00 AM ET.
| Solicitation number | W912DY26RA063 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W2V6 USA ENG SPT CTR HUNTSVIL |
| Set-aside | SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) |
| NAICS | 238910 Site Preparation Contractors SBA size standard: $19M average annual receipts |
| Product or service code | P400 Demolition of Buildings |
| Place of performance | 92277 |
| Posted | April 27, 2026 |
| Response due | May 7, 2026, 11:00 AM ET |
Who holds the work now
Largest current award in NAICS 238910 at the Department of the Army, by dollars obligated: NEUBER ENVIRONMENTAL SERVICE INC, current end date July 12, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912DY26RA063 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | April 27, 2026 | May 7, 2026, 11:00 AM ET |