FORT BENNING UESC RFP
Closed. Responses were due July 29, 2026, 12:00 PM ET.
| Solicitation number | W912DY26RA071 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W2V6 USA ENG SPT CTR HUNTSVIL |
| Set-aside | Not listed |
| NAICS | 541330 Engineering Services SBA size standard: $25.5M average annual receipts; exception for Military and Aerospace Equipment and Military Weapons: $47M average annual receipts; exception for Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992: $47M average annual receipts; exception for Marine Engineering and Naval Architecture: $47M average annual receipts |
| Product or service code | R425 Engineering and Technical Services |
| Place of performance | 31905 |
| Posted | June 28, 2026 |
| Response due | July 29, 2026, 12:00 PM ET |
Who holds the work now
Largest current award in NAICS 541330 at the Department of the Army, by dollars obligated: BAE SYSTEMS LAND & ARMAMENTS L.P., current end date May 14, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912DY26RA071 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | June 28, 2026 | July 29, 2026, 12:00 PM ET |