Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Closed. Responses were due July 27, 2026, 10:00 AM ET.

Solicitation numberW912DY26RA107
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2V6 USA ENG SPT CTR HUNTSVIL
Set-asideSBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
NAICS238910 Site Preparation Contractors
SBA size standard: $19M average annual receipts
Product or service codeP400 Demolition of Buildings
Place of performanceYuma, AZ, USA
PostedJuly 14, 2026
Response dueJuly 27, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 238910 at the Department of the Army, by dollars obligated: NEUBER ENVIRONMENTAL SERVICE INC, current end date July 12, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912DY26RA107 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationJuly 8, 2026July 22, 2026, 10:00 AM ET
SolicitationJuly 12, 2026July 22, 2026, 10:00 AM ET
SolicitationJuly 14, 2026July 27, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.