Notices · Presolicitation
W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Open. Responses are due in 3 days, on November 30, 2026, 1:00 PM ET.
| Solicitation number | W912EK27BA003 |
|---|---|
| Notice type | Presolicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W07V ENDIST ROCK ISLAND |
| Set-aside | 8(a) Set-Aside (FAR 19.8) (8A) |
| NAICS | 237310 Highway, Street, and Bridge Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1QA Construction of Restoration of Real Property (Public or Private) |
| Place of performance | Not listed |
| Posted | October 6, 2026 |
| Response due | November 30, 2026, 1:00 PM ET |
Who holds the work now
Largest current award in NAICS 237310 at the Department of the Army, by dollars obligated: SOUTHWEST VALLEY CONSTRUCTORS CO, current end date March 29, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912EK27BA003 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Pre-Solicitation - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation Completion Days: 365 Consecutive Calendar Days NAICS 237310 8(a) Competitive IFB The project includes, but is not limited to mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards;installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration. ETA for IFB is within 30-60 days.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | October 6, 2026 | November 30, 2026, 1:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.