Notices · Sources Sought
Naval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia and Nassau County, Florida
Closed. Responses were due May 11, 2026, 2:00 PM ET.
| Solicitation number | W912EP26X1BM2 |
|---|---|
| Notice type | Sources Sought |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W074 ENDIST JACKSNVLLE |
| Set-aside | Not listed |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Z1KF Maintenance of Dredging Facilities |
| Place of performance | Not listed |
| Posted | April 28, 2026 |
| Response due | May 11, 2026, 2:00 PM ET |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912EP26X1BM2 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Jacksonville District of the US Army Corps of Engineers (SAJ) is seeking interest from prospective offers for a potential fiscal year (FY) 2026 award of the subject project. The purpose of this sources sought is to gauge interest, capabilities, and qualifications of various members of the Dredging Community, to include Small Businesses, as the Government must ensure there is adequate competition amongst the potential pool of responsible contractors. Base project work involves maintenance dredging of the Kings Bay Entrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site (ODMDS)(D/A-O), the Fernandina Nearshore Placement Area (P/A-N), the Fort Clinch Placement Area (P/A-F), and the North Beach Placement Area (P/A-NB). Incidental work includes environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and sea turtle and sturgeon trawling. Option A project work consists of Fort Clinch pre-placement debris removal. Option B work includes interim demobilization and mobilization (cutter-suction and mechanical dredges only). Option C work includes beach tilling from FDEP Monument R-019 to R-029.The project is located in the St. Marys River and Cumberland Sound at the Georgia-Florida boundary in Camden County, Georgia and Nassau County, FL.The Target Price range is between $20,000,000 and $30,000,000. SEE ATTACHMENT FOR DETAILS AND SUBMISSION REQUIREMENTS.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | April 28, 2026 | May 11, 2026, 2:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.