Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Karup, Denmark DABS-FEV Laydown Site Construction

Open. No response date is listed. Check the notice text for how and when to respond.

Solicitation numberW912GB27RA010
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SD ENDIST EUROPE
Set-asideNone (full and open competition)
NAICS238910 Site Preparation Contractors
SBA size standard: $19M average annual receipts
Product or service codeY1PZ Construction of Other Non-Building Facilities
Place of performanceKarup, DNK
PostedNovember 5, 2026
Response dueNot listed

Who holds the work now

Largest current award in NAICS 238910 at the Department of the Army, by dollars obligated: NEUBER ENVIRONMENTAL SERVICE INC, current end date July 12, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912GB27RA010 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

See Presolicitation Notice Attachment for full details. ---- The United States Corps of Engineers Europe District (CENAU) has a requirement to provide a new laydown area including concrete tent pads, gravel bed, site improvements and utility connections for developing base expeditionary airfield resources (BEAR) to beddown personnel (550 pax) using Deployable Air Base System (DABS) sets supporting United States Air Force (USAF) contingency operations. The type of shelter in the standard DABS set is the Alaska Small Shelter System (AKSSS). BEAR assets in the standard DABS set to be accommodated within the beddown area include 72 billet shelters, two (2) latrine shelters, two (2) shower shelters, one (1) laundry shelter, one (1) 550-person kitchen package, four (4) command operations shelters, and three (3) morale, welfare, and recreation shelters. Supporting facilities include site development, utilities and connections (electrical power, domestic water & wastewater), and storm water drainage. As part of this anticipated construction contract, a utilities connection extension (domestic water and wastewater) to the limit of site will be performed through a host-nation-directed sole-source local contractor. The contact information for this contractor will be provided in the solicitation. The completed DABS Laydown Site electrical distribution system will use power provided via DABS generator sets; no electric utility grid connection is required. Primary Facilities to be Constructed: Gravel Bed - ~30,957 Square Meters Supporting Facilities to be Constructed (not all inclusive): Concrete Pads for Tents/Shelters Fencing Utilities

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationNovember 5, 2026