Notices · Solicitation
FY26 Medical University of South Carolina (MUSC) Pump Upfit
Closed. Responses were due September 11, 2026, 11:00 AM ET.
| Solicitation number | W912HP26RA026 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W074 ENDIST CHARLESTON |
| Set-aside | Not listed |
| NAICS | 237110 Water and Sewer Line and Related Structures Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1NE Construction of Water Supply Facilities |
| Place of performance | 29403 |
| Posted | September 3, 2026 |
| Response due | September 11, 2026, 11:00 AM ET |
Who holds the work now
Largest current award in NAICS 237110 at the Department of the Army, by dollars obligated: PCCP CONSTRUCTORS A JOINT VENTURE, current end date December 31, 2026. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912HP26RA026 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
FY26 Medical University of South Carolina (MUSC) Stormwater Pump Station - DESCRIPTION OF WORK: The Medical University of South Carolina (MUSC) stormwater pump station (PS), located in the Medical District on the Charleston Peninsula, is critical infrastructure for the City of Charleston (City). The MUSC drainage basin forms a topographic low point without a natural outlet, and the PS is required to facilitate drainage. Proposed improvements include: increased pumping capacity including both pump and discharge piping capacity; improved hydraulic configuration in the wet well and inflow chamber; enclosure and conditioning of the control room; elevating all critical electrical and HVAC equipment above the design flood elevation; replacement and upgrade of electrical, instrumentation and controls, security, and lighting; construction of a new transformer pad and installation of increased capacity transformer; replacement of both wet well inflow pipes to correct pipe slope; structural supports of pipes and transformer pad; construction of a permanent bypass connection; replacement of the chain link gate; and minor grading and landscaping around the perimeter slab. The project also includes temporary pumps and piping to maintain station operations during construction. MAGNITUDE OF WORK is estimated at: $5,000,000 TO $10,000,000 North American Industry Classification System (NAICS) Code: 237110, Water and Sewer Line Related THIS ACQUISITION IS UNRESTRICTED. This solicitation is hereby posted as of 7 August 2026. Amendment 0002 - Extension of proposal due date to 11 September 2026 and is hereby posted as of 20 August 2026.This admin update is just to correct the date and time in PIEE. Amendment 0004 is posted to provide Site Visit Sign-in Sheet and updated Specs and Drawings see Addendum 01, this Amendment is hereby post as of 4 September 2026.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | June 4, 2026 | |
| Sources Sought | July 22, 2026 | July 30, 2026, 12:00 PM ET |
| Solicitation | August 6, 2026 | September 8, 2026, 12:00 PM ET |
| Solicitation | August 10, 2026 | September 8, 2026, 12:00 PM ET |
| Solicitation | August 19, 2026 | September 11, 2026, 11:00 AM ET |
| Solicitation | August 19, 2026 | September 8, 2026, 12:00 PM ET |
| Solicitation | September 3, 2026 | September 11, 2026, 11:00 AM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.