Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan

Open. Responses are due in 59 days, on January 25, 2027, 12:00 AM ET.

Solicitation numberW912HV26RA009
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W2SN ENDIST JAPAN
Set-asideNot listed
NAICS237120 Oil and Gas Pipeline and Related Structures Construction
SBA size standard: $45M average annual receipts
Product or service codeY1NA Construction of Fuel Supply Facilities
Place of performanceNot listed
PostedOctober 18, 2026
Response dueJanuary 25, 2027, 12:00 AM ET

Who holds the work now

Largest current award in NAICS 237120 at the Department of the Army, by dollars obligated: ARKEL INTERNATIONAL, L.L.C., current end date December 1, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912HV26RA009 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 2 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price technically acceptable
Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.p…, page 27: "Contract award will be made to the responsible Offeror whose proposal represents the best value to the Government utilizing the Lowest Price Technically Acceptable (LPTA) source selection process."
Questions dueOctober 5, 2026, 11:59 (midnight) (JST)
Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.p…, page 12: "11:59 (midnight) on 5 October 2026 (JST)"
Site visitSeptember 10, 2026
Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.p…, page 1: "DATE: 10 SEPTEMBER 2026"
Site visitsee the quote
Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.p…, page 54: "We will escort visitors to an area inside the base as soon as base access has been processed."
Site visitSeptember 11, 2026
Site Visit Roster W912HV26RA009.pdf, page 1: "Date: 11-SEP-2026 Subject: Pre-Bid Site Visit"
Past performanceCompleted Past Performance Questionnaires shall be submitted with your proposal, unless unavailable.
Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.p…, page 21: "Completed Past Performance Questionnaires shall be submitted with your proposal, unless unavailable."

The notice text

The text below is SAM.gov's own, unedited.

Update 19 October 2026: Updated RFI Response Report has been posted to PIEE. Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationJuly 13, 2026August 31, 2026, 1:00 AM ET
SolicitationAugust 11, 2026January 25, 2027, 12:00 AM ET
SolicitationAugust 11, 2026January 25, 2027, 12:00 AM ET
SolicitationSeptember 8, 2026January 25, 2027, 12:00 AM ET
SolicitationSeptember 12, 2026January 25, 2027, 12:00 AM ET
SolicitationSeptember 24, 2026January 25, 2027, 12:00 AM ET
SolicitationOctober 18, 2026January 25, 2027, 12:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.