Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Open. No response date is listed. Check the notice text for how and when to respond.

Solicitation numberW912P726NF01
Notice typePresolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W075 ENDIST SAN FRAN
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237130 Power and Communication Line and Related Structures Construction
SBA size standard: $45M average annual receipts
Product or service codeY1MG Construction of Epg Facilities - Solar
Place of performance94043
PostedMarch 30, 2026
Response dueNot listed

Who holds the work now

Largest current award in NAICS 237130 at the Department of the Army, by dollars obligated: CCI FACILITY CONTRACTORS, LLC, current end date November 5, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912P726NF01 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. The solicitation will be available on/about April 15, 2026, for viewing/downloading. All proposals will be due on/about May 15, 2026, at 12:00PM PDT. The specific date and time will be identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationMarch 30, 2026

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.