Notices · Solicitation
Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA)
Closed. Responses were due August 19, 2026, 4:00 PM ET.
| Solicitation number | W912PL26BA005 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W075 ENDIST LOS ANGELES |
| Set-aside | Not listed |
| NAICS | 237990 Other Heavy and Civil Engineering Construction SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2) |
| Product or service code | Y1KF Construction of Dredging Facilities |
| Place of performance | Not listed |
| Posted | August 18, 2026 |
| Response due | August 19, 2026, 4:00 PM ET |
Who holds the work now
Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912PL26BA005 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Update - BID OPEING LOG IN INSTRUCTIONS for August 19, 2026 **AM03 - Updates Section 00 70 00 to include Clause 52.217-5. Nothing else is changed by way of this amendment* AM02 - Updates to Sections 00 07 00, 00 73 46, 01 57 19 and revised plan drawings. AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are 76 ft MLLW, and LARE channel depths are as deep as 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labeled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | July 13, 2026 | August 12, 2026, 4:00 PM ET |
| Solicitation | July 30, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 6, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 10, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 10, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 13, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 18, 2026 | August 19, 2026, 4:00 PM ET |
| Solicitation | August 18, 2026 | August 19, 2026, 4:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.