Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Special Notice

Project Labor Agreements (PLA) Sources Sought Notice for Coastal Storm Risk Management (CSRM) At Surf City, North Carolina

Closed. Responses were due July 17, 2026, 3:00 PM ET.

Solicitation numberW912PM27BA001
Notice typeSpecial Notice
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W074 ENDIST WILMINGTON
Set-asideNot listed
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1KF Construction of Dredging Facilities
Place of performance28445
PostedJuly 1, 2026
Response dueJuly 17, 2026, 3:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Department of the Army, by dollars obligated: THALLE CONSTRUCTION CO INC, current end date August 19, 2031. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912PM27BA001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The US Army Corps of Engineers, Wilmington District, is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for a large-scale construction project (exceeding $35 million) within the Surfy City, North Carolina area. This procurement is for Coastal Storm Risk Management (CSRM) for Surf City, North Carolina. The work consists of furnishing plant, labor, materials, and equipment to perform dredging, transporting, placing and shaping beach fill and performing all pre and post construction beach surveys. Approximately 1 borrow areas is available for the project and located offshore of Topsail Island Beaches at the south end of the island. The Surf City Coastal Storm Risk Management Project consists of placing 6,500,000 CY of Dune and Berm beach fill along approximately 33,300 LF of Surf City Beach. This project shall use either an ocean certified hopper and/or an ocean certified pipeline dredge. The project also consists of extending approximately 40 existing walkover structures in Surf City and the stabilization of approximately 46 to 56 acres of new dune. The solicitation is expected to be available in FY2027. See the attached document with additional details.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtJuly 1, 2026July 17, 2026, 3:00 PM ET
Special NoticeJuly 1, 2026July 17, 2026, 3:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.