United States Space Force Integration Facility
Open. Responses are due in 27 days, on December 24, 2026, 1:00 AM ET.
| Solicitation number | W912QR279A005 |
|---|---|
| Notice type | Solicitation |
| Agency | DEPT OF DEFENSE, DEPT OF THE ARMY, W072 ENDIST LOUISVILLE |
| Set-aside | Not listed |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1BZ Construction of Other Airfield Structures |
| Place of performance | Not listed |
| Posted | November 23, 2026 |
| Response due | December 24, 2026, 1:00 AM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Department of the Army, by dollars obligated: WALSH - TURNER JV II, current end date April 7, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read W912QR279A005 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
USACE Louisville District issues this Request for Qualifications (RFQ) to identify and select the single most highly qualified Design-Build Team to execute the United States Space Force (USSF) Integration Facility (UIF) project at Wright-Patterson Air Force Base (WPAFB), Ohio.The project provides a new, multi-floor, approximately 333,700-square-foot secure USSF Integration Facility and a physical connection to active Building F/10854. The project includes site work; utility distribution integration; high-efficiency HVAC and other MEP systems designed for continuous operations; replacement of two (2) existing end-of-life 2000 kW backup generators; high-security electrical switchgear; a secure structural and envelope system; specialized controlled spaces, commissioning, and accreditation activities.The Government will provide available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate that baseline and may recommend refinements. Any material deviation from the Government baseline requires Government review and approval.Sustained Mission Readiness: Building F/10854 will remain fully occupied and operational throughout construction. The Design-Builder must plan and execute all work to avoid unscheduled interruption of 24/7 mission operations, utilities, communications, and existing secure-facility accreditation.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | November 23, 2026 | December 24, 2026, 1:00 AM ET |