Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

United States Space Force Integration Facility

Open. Responses are due in 27 days, on December 24, 2026, 1:00 AM ET.

Solicitation numberW912QR279A005
Notice typeSolicitation
AgencyDEPT OF DEFENSE, DEPT OF THE ARMY, W072 ENDIST LOUISVILLE
Set-asideNot listed
NAICS236220 Commercial and Institutional Building Construction
SBA size standard: $45M average annual receipts
Product or service codeY1BZ Construction of Other Airfield Structures
Place of performanceNot listed
PostedNovember 23, 2026
Response dueDecember 24, 2026, 1:00 AM ET

Who holds the work now

Largest current award in NAICS 236220 at the Department of the Army, by dollars obligated: WALSH - TURNER JV II, current end date April 7, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read W912QR279A005 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

USACE Louisville District issues this Request for Qualifications (RFQ) to identify and select the single most highly qualified Design-Build Team to execute the United States Space Force (USSF) Integration Facility (UIF) project at Wright-Patterson Air Force Base (WPAFB), Ohio.The project provides a new, multi-floor, approximately 333,700-square-foot secure USSF Integration Facility and a physical connection to active Building F/10854. The project includes site work; utility distribution integration; high-efficiency HVAC and other MEP systems designed for continuous operations; replacement of two (2) existing end-of-life 2000 kW backup generators; high-security electrical switchgear; a secure structural and envelope system; specialized controlled spaces, commissioning, and accreditation activities.The Government will provide available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate that baseline and may recommend refinements. Any material deviation from the Government baseline requires Government review and approval.Sustained Mission Readiness: Building F/10854 will remain fully occupied and operational throughout construction. The Design-Builder must plan and execute all work to avoid unscheduled interruption of 24/7 mission operations, utilities, communications, and existing secure-facility accreditation.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationNovember 23, 2026December 24, 2026, 1:00 AM ET