Notices · Sources Sought
66--IRA - High-Temperature Chamber Furnace
Closed. Responses were due November 16, 2026, 1:00 PM ET.
| Solicitation number | 89243327NEX000003 |
|---|---|
| Notice type | Sources Sought |
| Agency | ENERGY, DEPARTMENT OF, NATIONAL ENERGY TECHNOLOGY LABORATORY |
| Set-aside | Not listed |
| NAICS | 333994 Industrial Process Furnace and Oven Manufacturing SBA size standard: 500 employees |
| Product or service code | 6640 Laboratory Equipment and Supplies |
| Place of performance | Not listed |
| Posted | November 9, 2026 |
| Response due | November 16, 2026, 1:00 PM ET |
Who holds the work now
Largest current award in NAICS 333994 at the Department of Energy, by dollars obligated: RETECH SYSTEMS LLC, current end date December 7, 2026. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 89243327NEX000003 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | November 4, 2026 | November 16, 2026, 1:00 PM ET |
| Sources Sought | November 9, 2026 | November 16, 2026, 1:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.