PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Open. Responses are due in 6 days, on December 3, 2026, 3:00 PM ET.

Solicitation number378854_MR
Notice typeSolicitation
AgencyENERGY, DEPARTMENT OF, FERMILAB - DOE CONTRACTOR
Set-asideNone (full and open competition)
NAICS23822
Product or service codeK056 Modification of Equipment: Construction and Building Materials
Place of performanceBatavia, IL 60510, USA
PostedNovember 15, 2026
Response dueDecember 3, 2026, 3:00 PM ET

Who holds the work now

USAspending shows no current award in NAICS 23822 at the Department of Energy, and this notice names no contract we hold.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 378854_MR in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 32 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price technically acceptable
378854_MR.pdf, page 8: "This is a lowest price-technically acceptable source selection."
Questions dueNovember 5, 2026, 4:00 CST
378854_MR.pdf, page 4: "must request it in writing by November 5, 2026, 4:00 CST, and be submitted to the Procurement Specialist"
Site visitsee the quote
EXHIBIT_9_010010 General Requirements.pdf, page 6: "The Subcontractor and/or Sub-subcontractors are expected to make a site visit and make allowances for all necessary adjustments for the actual system installation"
BondingPayment and Performance Bonds
EXHIBIT_9_010010 General Requirements.pdf, page 12: "Payment and Performance Bonds"
BondingBid guarantee
378854_MR.pdf, page 6: "The offeror shall provide a bid guarantee in the amount of not less than 20 percent (not to exceed $3 million) of the bid price."
BondingPayment bond
378854_MR.pdf, page 6: "If the subcontract exceeds $35,000.00, the successful offeror is required to furnish FFDG with a Payment Bond in the amount of 100 percent of the original subcontract price"
Bonding1 more in the files, not shown here.
Past performanceAt least ten years of contractor experience on comparable projects
378854_MR.pdf, page 9: "The offeror shall demonstrate at least ten (10) years of business experience as a contractor on projects comparable in size, scope and complexity to the project described herein."
Contract typefirm-fixed-price
378854_MR.pdf, page 10: "The proposal pricing shall be a firm-fixed-price for the work."

The notice text

The text below is SAM.gov's own, unedited.

This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: October 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: December 3, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID. Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable. No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationOctober 7, 2026November 19, 2026, 3:00 PM ET
SolicitationNovember 1, 2026November 19, 2026, 3:00 PM ET
SolicitationNovember 2, 2026November 19, 2026, 3:00 PM ET
SolicitationNovember 11, 2026December 3, 2026, 3:00 PM ET
SolicitationNovember 15, 2026December 3, 2026, 3:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.