RF Roof Replacement Project

Open. Responses are due in 13 days, on December 10, 2026, 4:00 PM ET.

Solicitation numberRFP27-005JR
Notice typeCombined Synopsis/Solicitation
AgencyENERGY, DEPARTMENT OF, PRINCETON LAB - DOE CONTRACTOR
Set-asideNone (full and open competition)
NAICS238160 Roofing Contractors
SBA size standard: $19M average annual receipts
Product or service codeY1EZ Construction of Other Industrial Buildings
Place of performancePrinceton, NJ 08543, USA
PostedNovember 8, 2026
Response dueDecember 10, 2026, 4:00 PM ET

Who holds the work now

USAspending shows no current award in NAICS 238160 at the Department of Energy, and this notice names no contract we hold.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read RFP27-005JR in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 14 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price technically acceptable
RFP 27-005JR Evaluation and Basis for Award.pdf.pdf, page 2: "The “Lowest-Price Technically Acceptable” standard shall be utilized to select the successful offeror."
Evaluationbest value
RFP 27-005JR Evaluation and Basis for Award.pdf.pdf, page 1: "plans to award a Firm Fixed Price Subcontract to the Offeror whose proposal represents the Best Value to PPPL"
Site visitsee the quote
Specification-RF Roof Replacement.pdf, page 11: "The Subcontractor and/or lower-tier subcontractors are expected to make a site visit and make allowances for all necessary adjustments"
BondingPerformance and Payment bonds
Specification-RF Roof Replacement.pdf, page 17: "1. Performance and Payment bonds"
Past performanceten (10) years of field experience in work of this nature
Specification-RF Roof Replacement.pdf, page 173: "Qualifications of Contractor for work of this Section shall not be less than ten (10) years of field experience in work of this nature."
Past performanceminimum of 10 years of construction quality control experience
Specification-RF Roof Replacement.pdf, page 103: "The SQCC shall have a minimum of 10 years of construction quality control experience on construction similar to that of this Subcontract, or as otherwise approved by PPPL."
Past performanceInstaller with documented experience on projects of a similar size and complexity
Specification-RF Roof Replacement.pdf, page 184: "Utilize an installer having documented experience on projects of a similar size and complexity."
Past performance2 more in the files, not shown here.
Contract typefirm-fixed-price
Specification-RF Roof Replacement.pdf, page 7: "Part G - Provisions & Conditions for Fixed Price Construction Subcontracts"

The notice text

The text below is SAM.gov's own, unedited.

The Princeton Plasmas Physics Laboratory is seeking a qualified contractor to replace roofing on two existing roofs. The (C40 RF Building & C41 CS Building) which are past their useful life requiring costly maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures, and flashing. Portions of existing metal coping have pulled away during storm events causing large sections of membrane to separate from the substrate. A catastrophic failure to one of these roofs would negatively impact the ability to conduct the top priority experimental operations in the Laboratory. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise required to replace the noted roofs and specified components per the associated contractdesign documents. Construction scope includes the following: Remove and replace existing built-up roofs at PPPL. Buildings include: a. C40 – RF Building b. C41 – CS Building All work shall be perfomed IAW SOW titled: C40 & C41 RF ROOF REPLACEMENT CONSTRUCTION dated 28 Aug 2026 The project drawing have not been posted. The drawings will be released to offerors (on an as requested basis) when we receive the following information and documents (1) An e-mail confirmation of your intent to participate in the site visit/pre-bid meeting scheduled for 11/17/26 (2) A signed solicitation acknowledgement form (3) Identification of your lead proposal manager for this solictation via e-mail (4) A written request for project drawings (see attached form) The link to complete your Princeton supplier registration is referenced below:: https://finance.princeton.edu/buying-paying/suppliers/becoming-princeton-supplier **To be eligible to participate in this solicitation your firm must submit the acknowlegment form to us NLT 4:00 PM on 9 Nov 2026

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationOctober 29, 2026December 10, 2026, 4:00 PM ET
Combined Synopsis/SolicitationNovember 1, 2026December 10, 2026, 4:00 PM ET
Combined Synopsis/SolicitationNovember 1, 2026December 10, 2026, 4:00 PM ET
Combined Synopsis/SolicitationNovember 1, 2026December 10, 2026, 4:00 PM ET
Combined Synopsis/SolicitationNovember 4, 2026December 10, 2026, 4:00 PM ET
Combined Synopsis/SolicitationNovember 8, 2026December 10, 2026, 4:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.