Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Open. Responses are due in 20 days, on December 17, 2026, 5:00 PM ET.

Solicitation numberRFP-376508-CD
Notice typeSolicitation
AgencyENERGY, DEPARTMENT OF, FERMILAB - DOE CONTRACTOR
Set-asideNone (full and open competition)
NAICS236210 Industrial Building Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2EZ Repair or Alteration of Other Industrial Buildings
Place of performanceBatavia, IL 60510, USA
PostedNovember 18, 2026
Response dueDecember 17, 2026, 5:00 PM ET

Who holds the work now

USAspending shows no current award in NAICS 236210 at the Department of Energy, and this notice names no contract we hold.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read RFP-376508-CD in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 21 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Bonding100% Performance Bond and 100% Payment Bond
Exhibit K- Price Proposal Form.pdf, page 3: "full compensation for the required 100 percent (100%) Performance Bond, 100 Percent (100%) Payment Bond, all required insurance"
Contract typefirm-fixed-price
Exhibit K- Price Proposal Form.pdf, page 1: "Please enter your total firm fixed price in words and numbers:"

The notice text

The text below is SAM.gov's own, unedited.

On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates. On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationSeptember 16, 2026November 17, 2026, 5:00 PM ET
SolicitationOctober 5, 2026November 17, 2026, 5:00 PM ET
SolicitationOctober 6, 2026November 17, 2026, 5:00 PM ET
SolicitationOctober 29, 2026December 17, 2026, 5:00 PM ET
SolicitationNovember 18, 2026December 17, 2026, 5:00 PM ET