Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Open. Responses are due in 21 days, on December 18, 2026, 5:00 PM ET.

Solicitation numberRFP-383167-CD
Notice typeSolicitation
AgencyENERGY, DEPARTMENT OF, FERMILAB - DOE CONTRACTOR
Set-asideNone (full and open competition)
NAICS237130 Power and Communication Line and Related Structures Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2MZ Repair or Alteration of Epg Facilities - Other, Including Transmission
Place of performanceBatavia, IL 60510, USA
PostedNovember 4, 2026
Response dueDecember 18, 2026, 5:00 PM ET

Who holds the work now

Largest current award in NAICS 237130 at the Department of Energy, by dollars obligated: EAST COAST POWERLINE LLC, current end date October 14, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read RFP-383167-CD in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 18 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Site visitsee the quote
Exhibit C- Specification Set.pdf, page 9: "The General contractor and/or Trade sub-contractors are expected to make a site visit, create an existing building model based on LiDAR scan"
Bonding100 percent Performance Bond and 100 percent Payment Bond
Exhibit H- Price Proposal Form.pdf, page 3: "Measurement and payment for this Bid Item shall include full compensation for the required 100 percent (100%) Performance Bond, 100 Percent (100%) Payment Bond"
BondingPayment and Performance Bonds
Exhibit C- Specification Set.pdf, page 14: "2. Payment and Performance Bonds"
Past performanceEMR rates and OSHA 300 log for last three years
Exhibit C- Specification Set.pdf, page 44: "Experience Modification Rating (EMR) Rates and Occupational Safety Health"
Past performanceTree service firm with similar temporary tree and plant protection work
Exhibit C- Specification Set.pdf, page 136: "Tree Service Firm Qualifications: An experienced tree service firm that has successfully completed temporary tree and plant protection work similar to that required for this Project"
Past performanceFacilitator with a record of successful learning performance in a similar training program
Exhibit C- Specification Set.pdf, page 187: "in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance."
Contract typefirm-fixed-price
Exhibit H- Price Proposal Form.pdf, page 1: "Please enter your total firm fixed price in words and numbers:"

The notice text

The text below is SAM.gov's own, unedited.

November 5, 2026- Amendment 1 issued to clarify timne and location of the Pre-Proposal Meeting. This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationNovember 1, 2026December 18, 2026, 5:00 PM ET
SolicitationNovember 4, 2026December 18, 2026, 5:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.