Provision of Services for Supply and Installation of Swimming Pool Tiles at US Consulate General Karachi
Open. Responses are due in 5 days, on December 2, 2026, 5:00 AM ET.
| Solicitation number | 19PK4027Q5002 |
|---|---|
| Notice type | Solicitation |
| Agency | STATE, DEPARTMENT OF, AMERICAN CONSULATE KARACHI |
| Set-aside | Not listed |
| NAICS | 238340 Tile and Terrazzo Contractors SBA size standard: $19M average annual receipts |
| Product or service code | Z2PA Repair or Alteration of Recreation Facilities (Non-Building) |
| Place of performance | Karachi, PK-SD, PAK |
| Posted | November 11, 2026 |
| Response due | December 2, 2026, 5:00 AM ET |
Who holds the work now
USAspending shows no current award in NAICS 238340 at the Department of State, and this notice names no contract we hold.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 19PK4027Q5002 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from all 2 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | lowest price technically acceptable RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 52: "Award will be made to the lowest priced, acceptable, responsible quoter." |
|---|---|
| Evaluation factors | Lowest priced, acceptable, responsible quoter; acceptability by compliance with RFQ terms; responsi… RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 52: "The Government will determine responsibility by analyzing whether the apparent successful quoter complies with the requirements of FAR 9.1, including:" |
| Evaluation factors | Acceptability by compliance with RFQ terms; responsibility per FAR 9.1; specify proposed stone, adh… RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swi…, page 54: "Specify/identify the proposed stone, adhesive, and grout, and to submit manufacturer data or test reports showing the material meet the specification table" |
| Questions due | November 20, 2026, COB RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 1: "Following the site visit all relevant questions must be submitted no later than COB November 20, 2026" |
| Questions due | November 23, 2026, COB RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swi…, page 1: "Following the site visit all relevant questions must be submitted no later than COB November 23, 2026" |
| Site visit | November 19, 2026, optional RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swi…, page 1: "The Consulate intends to conduct a pre-quotation site visit on November 19, 2026, at 11:00am (Pakistan standard time)." |
| Bonding | Performance and payment bonds, or alternate payment protection of 20% of the contract price RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 27: "The Contractor shall furnish some form of payment protection as described in 52.228-13 in the amount of 20% of the contract price." |
| Bonding | Performance and payment protection: 20% of the contract price RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swi…, page 29: "The Contractor shall furnish some form of payment protection as described in 52.228-13 in the amount of 20% of the contract price." |
| Past performance | 3 years experience installing natural stone in exterior and wet areas, or equivalent projects techn… RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 48: "Contractors should have experience of 3 years installing natural stone in exterior and wet areas OR equivalent to projects completed technically same as defined in scope." |
| Past performance | 3 years successful completion of pool deck related relevant civil work projects RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 48: "Contractors should have experience of 3 years successful completion of pool deck related relevant civil work projects." |
| Past performance | 3 years experience installing natural stone in exterior and wet areas, or equivalent RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swi…, page 50: "Contractors should have experience of 3 years installing natural stone in exterior and wet areas OR equivalent to projects completed technically same as defined in scope." |
| Contract type | firm-fixed-price RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool…, page 9: "To hire professional contractor services under a firm fixed price contract to for supply and installation of Swimming pool floor deck tiles" |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool Deck Tiles.pdf
- SF30_RFQ 19PK4027Q5002 Supply and Installation of Swimming Pool tiles.pdf
- RFQ(Rev) -19PK4027Q5002-001- Supply and Installation of Swimming Pool Deck Tiles.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | November 3, 2026 | December 2, 2026, 5:00 AM ET |
| Solicitation | November 11, 2026 | December 2, 2026, 5:00 AM ET |