FWS - Pixley NWR Water Recirculation Design-Build

Open. Responses are due in 3 days, on November 30, 2026, 12:00 PM ET.

Solicitation number140FF027R0003
Notice typeCombined Synopsis/Solicitation
AgencyINTERIOR, DEPARTMENT OF THE, DEPARTMENTAL OFFICES, FWS CONTRACTING ACTIVITY
Set-asideSmall Business Set Aside - Total (SBA)
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeY1JZ Construction of Miscellaneous Buildings
Place of performanceNot listed
PostedOctober 29, 2026
Response dueNovember 30, 2026, 12:00 PM ET

Who holds the work now

Largest current award in NAICS 237990 at the Departmental Offices, by dollars obligated: NW CONSTRUCTION, INC, current end date February 7, 2029. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 140FF027R0003 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 7 of 8 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price technically acceptable
Sol_140FF027R0003.pdf, page 140: "This award will be made based off of the Lowest Price Technically Acceptable (LPTA)"
Evaluation factorstechnical approach and Price
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 1: "The basis of contract will be on technical approach and Price, as acceptability for this requirement below."
Evaluation factorsFACTOR 1 – RECENT RELEVANT EXPERIENCE; FACTOR 2 – Bond Capability; FACTOR 3 – PRICE
Sol_140FF027R0003.pdf, page 141: "The following evaluation factors will be used to evaluate each proposal: FACTOR 1 – RECENT RELEVANT EXPERIENCE FACTOR 2 – Bond Capability FACTOR 3 – PRICE"
Questions dueNovember 24, 2026, 9:00 AM PST
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 2: "Question Deadline Date: 9:00 AM PST – Wednesday, November 24, 2026"
Site visitNovember 17, 2026
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 2: "Site Visit: 10:00 AM PST - Tuesday, November 17, 2026"
Site visitoptional
Attachment__2_-_Design_Build_General_Requirements.pdf, page 5: "Contractor(s) are recommended to attend a scheduled site visit."
Bondingbid bond, payment bond, and performance bond
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 2: "A bid bond is required. Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond."
Bondingbid bond
Sol_140FF027R0003.pdf, page 3: "issued. A bid bond is required."
BondingPerformance and payment bonds; letter from surety confirming bonding capacity
Sol_140FF027R0003.pdf, page 141: "The contractor shall provide a current letter from its surety company or authorized bonding agent confirming sufficient bonding capacity to obtain the performance and payment bonds required for this project."
Past performancerelevant experience designing and installing water conveyance and pumping systems
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 1: "The contractor shall demonstrate relevant experience designing and installing water conveyance and pumping systems to most efficiency for Pixley Wetland Water Recirculation project."
Past performanceTwo relevant projects 100% completed within five years of the closing date
Sol_140FF027R0003.pdf, page 141: "Provide two relevant (2) projects that have been 100% completed within five (5) years of the closing date of this solicitation."
Contract typefirm-fixed-price
Solicitation_-_Combined_Synopsis_Announcement.pdf, page 1: "the standard Award that will be made as a firm-"

The notice text

The text below is SAM.gov's own, unedited.

This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12, as supplemented with additional information included in this notice. This announcement constitutes only solicitation. Offers are being requested, and a separate written solicitation will not be issued. The U.S. Fish & Wildlife Service, Pixley National Wildlife Refuge provides 755 acres of wetland habitat for migratory waterfowl and other water birds and relies on three deep groundwater wells for irrigation and flooding. This project will improve water reuse and reduce groundwater pumping demands, particularly during drought years. The contractor shall design and construct a water recirculation system consisting of approximately 1.2 miles of PVC pipeline connecting the wetlands¿ lowest topographical point to the existing pipeline farther east. The system shall include a pump at this low point to move water upslope for recirculation and critical irrigation. The contractor shall secure the pump station with a 12-foot-tall, gated chain-link enclosure topped with barbed wire. Excavated soil may be reused on refuge property, and restoration or seeding of disturbed ground will not be required. The construction magnitude is estimated to be between $700,000.00 to $750,000.00. The office is located ¿ Meeting Point: LAT: 35°54'23.08"N LONG: 119°22'33.14"W Pixley National Wildlife Refuge 10811 Corcoran Road Delano, CA 93215 Kern County, California The anticipated performance period shall be completed within Notice to Proceed (NTP) + 120 Days being issued. Wage Rates: General Wage Rate Decision Number: CA20260005 (07/30/2026) State: California County: California Counties of Inyo, Kern and Mono This Request for Proposal (RFP) is a TOTAL SMALL BUSINESS SET ASIDE and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2025-07. The NAICS code is 237990, and the small business (SB) size standard is $45.0M. Instructions to offeror: All responsible small business sources shall review all documentation and submit a proposal, which shall be considered by the agency. The contractor shall demonstrate relevant experience designing and installing water conveyance and pumping systems to most efficiency for Pixley Wetland Water Recirculation project. Proposals shall identify all required contractor parties for this work and provide evidence of applicable California licenses and certifications. All design and construction shall comply with applicable federal, state, and local requirements and achieve efficient, reliable operation consistent with the Statement of Work and other attachments. Offerors shall submit proposals electronically via email in accordance with the instructions below. Failure to submit all required documents may result in the proposal being determined non-responsive. Furthermore, read the entity¿s solicitation packet with statement of work (SOW) and attachments for additional details to create bid with technical approach to the standard Award that will be made as a firm-fixed-price contract. The basis of contract will be on technical approach and Price, as acceptability for this requirement below. Award of the contract will be made to a responsible source pursuant to FAR subpart 9.1. Please submit your proposal with solicitation document (showing unit and total price) on company letterhead; Pricing Form; SAM.gov UEI code; point of contact phone number and e- mail address. Refer to FAR provision 52.212-1 Instructions to Offerors ¿ Commercial Items for additional submission guidance and include a copy of FAR provision 52.212-3 Offeror Representations and Certifications -- Commercial Items with applicable sections completed. Bonds: A bid bond is required. Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds. Bonds are due no later than 10 calendar days after award. Due to the project magnitude, both payment and performance bonds will be required. Format for Proposals: 1. Proposals shall be 8 ½¿x 11¿ 2. A page is defined as one face of a sheet of paper containing information 3. Typing shall not be less than 12 pitches (Times New Roman/Ariel/Etc.), 1-inch border, no artistic script fonts for readability 4. Elaborate formats, bindings or color presentations are not desired or required Any and all questions shall be submitted via email only; no verbal questions will be accepted. Please be sure to include the solicitation number in your proposal and in the subject line of any email submitted. E-Mail Submission for Questions & Proposals: terrence_anderson@ios.doi.gov Site Visit: 10:00 AM PST - Tuesday, November 17, 2026 Question Deadline Date: 9:00 AM PST - Wednesday, November 24, 2026 Proposal/Bid Due: 9:00 AM PST - Monday, November 30, 2026 Solicitation Package: ¿Solicitation Announcement ¿SF1442 - Solicitation ¿Clauses & Provisions (Terms and Conditions) ¿Wage Rate Determination ¿Statement of Work (SOW) ¿Four (4) SOW Attachments In order to have a quote considered for award, respondent must be registered at the System for Award Management (SAM) website (https://www.sam.gov ) as an active vendor by the time an award decision is necessary.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationOctober 29, 2026November 30, 2026, 12:00 PM ET

Open solicitations like this one