Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Z--Folsom Dam Vessel Exclusion Barrier and Debris Boom

Open. No response date is listed. Check the notice text for how and when to respond.

Solicitation number140R2026B0001
Notice typePresolicitation
AgencyINTERIOR, DEPARTMENT OF THE, BUREAU OF RECLAMATION, MP-REGIONAL OFFICE
Set-asideNot listed
NAICS237990 Other Heavy and Civil Engineering Construction
SBA size standard: $45M average annual receipts; exception for Dredging and Surface Cleanup Activities: $37M average annual receipts (SBA footnote 2)
Product or service codeZ1NE Maintenance of Water Supply Facilities
Place of performanceNot listed
PostedJune 11, 2026
Response dueNot listed

Who holds the work now

Largest current award in NAICS 237990 at the Bureau of Reclamation, by dollars obligated: NW CONSTRUCTION, INC, current end date December 31, 2026. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 140R2026B0001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

The California Great Basin Region of the Bureau of Reclamation intends to issue an Invitation for Bid (IFB) for a firm fixed-price construction contract for Folsom Dam Vessel Exclusion Barrier and Debris Boom. This procurement will be advertised as a Total Small Business set aside. Solicitation will be issued as an Invitation for Bid (IFB) using FAR Part 14, Sealed Bidding procedures. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $45M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. All responsible sources may submit a bid which will be considered by the agency. The estimated cost of this project is between $5 Million and $10 Million. This procurement will require 100% performance and payment bonds. The work is located at U.S. Bureau of Reclamation, Folsom, California. PRINCIPAL COMPONENTS OF WORK: • Remove and salvage part of the existing barrier on the Folsom dam as shown on the contract drawings. • Design, furnish and install a new vessel exclusion barrier and debris curtain and its components listed on this specification. • Furnish and install onshore anchor on the right-wing side of the dam. • Removal of obstruction along the path of the barrier to the onshore anchor and filling the large gaps on the existing riprap with smaller rocks on the right wing dam. • Furnish and install necessary warning lights and signage. • Design, furnish and installation of necessary anchors, clump anchors, buoys and moorings. • Provide certification of the new barrier according to the requirements set forth on this specification. • Provide one (1) spare module and two (2) spare module-to-module connectors and the required hardware for use. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. Solicitation 140R2026B0001 will be posted electronically via www.sam.gov on or about June 29, 2026. The date for receipt of offers will be approximately July 30, 2026. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award. Questions concerning this solicitation should be directed to Rosana Yousef Goarji via email at rosana_yousefgoarji@ios.doi.gov . Construction Contraction Administration: Revolutionary Federal Acquisition Regulation Overhaul (RFO) 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationJune 11, 2026

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.