Notices · Solicitation
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Open. Responses are due in 59 days, on January 25, 2027, 12:00 PM ET.
| Solicitation number | 140RR027B0004 |
|---|---|
| Notice type | Solicitation |
| Agency | INTERIOR, DEPARTMENT OF THE, BUREAU OF RECLAMATION, UPPER COLORADO REGIONAL OFFICE |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237110 Water and Sewer Line and Related Structures Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1KZ Construction of Other Conservation and Development Facilities |
| Place of performance | Not listed |
| Posted | November 15, 2026 |
| Response due | January 25, 2027, 12:00 PM ET |
Who holds the work now
Largest current award in NAICS 237110 at the Bureau of Reclamation, by dollars obligated: CDM CONSTRUCTORS INC, current end date February 28, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 140RR027B0004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 8 of 12 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | lowest price 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001…, page 82: "Award will be made to the responsible offeror that is compliant with the terms of the solicitation, who presents proof of the appropriate bid guarantee, and is the lowest priced bid opened." |
|---|---|
| Questions due | November 30, 2026, 1PM MST SITE_TOUR_AGENDA_Reach_21_Booster_Site_0002.pdf, page 1: "All questions must be submitted in writing to Contracting Officer and Contracting Specialist no later than November 30, 2026, 1PM MST" |
| Questions due | November 30, 2026, 1 p.m. MST Sol_140RR027B0004_Amd_0002.pdf, page 2: "Q&A dates added on Page 4: Questions are due: November 30,2026, at 1 p.m. MST." |
| Site visit | November 12, 2026 SITE_TOUR_AGENDA_Reach_21_Booster_Site_0002.pdf, page 1: "Pre-Bid Conference/Site Tour Agenda" |
| Site visit | see the quote Sol_140RR027B0004_Amd_0002.pdf, page 2: "3. Site visit sign-in sheet is attached." |
| Bonding | bid guarantee 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001…, page 77: "The amount of the bid guarantee shall be 20 percent of the bid price or $2 million, whichever is less." |
| Past performance | System provider: at least 5 years of successful performance providing required services Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026…, page 30: "System provider: At least 5-years successful performance in providing required services." |
| Past performance | Competent supervisory employee with current safety and health training, experience, and duties on a… Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026…, page 75: "Competent supervisory employee with current safety and health related training, experience, and duties on at least three projects of similar nature, size, complexity, and work to be performed as current project" |
| Past performance | Minimum 4 years' construction experience in charge of quality control for projects similar in nature Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026…, page 89: "with minimum 4-years’ construction experience in charge of quality control for projects similar in nature to that required by this contract" |
| Contract type | firm-fixed-price 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001…, page 11: "Unit of Measure: AU (Activity Unit) Firm Fixed Price" |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- SITE_TOUR_AGENDA_Reach_21_Booster_Site_0002.pdf
- Attachment_4_-_NM20260046_Building_-_wage_determination_-_4_pages.pdf
- Attachment_3_-_NM20260040_Heavy_-_wage_determination_-_4_pages.pdf
- 140RR027B0004_R21_CL_Booster_Plant_solicitation_4Nov26_0001.pdf
- Sol_140RR027B0004.pdf
- Attachment_1_-_00_00_01A_Specifications_DZ_Booster_06162026_Final_654_pg.pdf
- Attachment_5_-_Construction_Contract_Administration.pdf
- Attachment_2_-_00_00_02_100__DRAWINGS_34x22_20261027_rev_Final_97_pg.pdf
- Sol_140RR027B0004_Amd_0002.pdf
- Reach_21_Booster_Site_Visit_meet_up_location_change_4Nov26_0001.pdf
- Sol_140RR027B0004_Amd_0001.pdf
- NGWSP_-_Reach_21_DZ_Booster_PP_Prebid__Site_Visit_-_November_12_2026_0002.pdf
- Updated_140RR027B0004_R21_CL_Booster_Plant_solicitation_16Nov26_0002.pdf
- 140R4027B0004_NGWSP_R21_CL_Booster_Plant_solicitation_2Nov26.pdf
- CL_Reach_21_Booster_Plant_Site_Tour_Attendance_0002.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | November 1, 2026 | January 25, 2027, 12:00 PM ET |
| Solicitation | November 3, 2026 | January 25, 2027, 12:00 PM ET |
| Solicitation | November 15, 2026 | January 25, 2027, 12:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.