Notices · Solicitation
Cooling Tower, Roofing, and Structural Construction
Open. Responses are due in 14 days, on December 11, 2026, 1:00 PM ET.
| Solicitation number | 2031ZA26R00027 |
|---|---|
| Notice type | Solicitation |
| Agency | TREASURY, DEPARTMENT OF THE, BUREAU OF ENGRAVING AND PRINTING, OFFICE OF THE CHIEF PROCUREMENT OFFICER |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Z2EC Repair or Alteration of Production Buildings |
| Place of performance | DC 20024, USA |
| Posted | November 11, 2026 |
| Response due | December 11, 2026, 1:00 PM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Bureau of Engraving and Printing, by dollars obligated: VALCORP ENTERPRISES LLC, current end date December 31, 2026. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 2031ZA26R00027 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 8 of 12 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | tradeoff (factors other than price can outweigh price) 2031ZA26R00027.pdf, page 84: "The award decision will be based on a best value trade-off among the evaluation factors; therefore, the Government may not award to the lowest price" |
|---|---|
| Evaluation factors | 1) Corporate Experience, 2) Past Performance, 3) Technical Approach; 4) Key Personnel 5) Project Pl… 2031ZA26R00027.pdf, page 84: "Award will be based on the following factors 1) Corporate Experience, 2) Past Performance, 3) Technical Approach; 4) Key Personnel 5) Project Plan; and 6) Price." |
| Questions due | October 5, 2026, 12:00 noon ET 2031ZA26R00027.pdf, page 79: "ALL QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 noon ET, Monday, October 5, 2026." |
| Site visit | September 30, 2026 2031ZA26R00027.pdf, page 1: "A pre-proposal site visit has been scheduled for 09/30/2026 at 9:00 AM. Must RSVP via email to the Contracting Officer at least 5 days prior to the site visit." |
| Clearance | Personnel background investigation (Tier 1) Attachment 3 - Statement of Work - Cooling Towers Revision…, page 24: "will be required to undergo at a minimum a (Tier 1) background investigation in addition to the requirements for Short Term access" |
| Clearance | background investigations, conducted by BEP’s Office of Personnel Security Attachment 3 - Statement of Work - Cooling Towers.pdf, page 14: "Contractor personnel performing work under this ordering agreement shall be subjects of background investigations, conducted by BEP’s Office of Personnel Security, prior to the start of work under this ordering agreement." |
| Bonding | Performance bond (SF-25) and payment bond (SF-25A), each for 10% of the contract amount, within ten… 2031ZA26R00027.pdf, page 20: "Performance Bond: The Contractor shall furnish the Contracting Officer within ten (10) calendar days after award a "Performance Bond" (SF-25) for 10% of the amount of the contract." |
| Bonding | Payment bond or irrevocable letter of credit for 100 percent of the contract price, within 14 days… 2031ZA26R00027.pdf, page 56: "The amount of the payment protection shall be 100 percent of the contract price." |
| Past performance | Demonstrated experience in large-scale condenser water system installations Attachment 3 - Statement of Work - Cooling Towers Revision…, page 2: "The work shall be performed by a qualified HVAC/mechanical contractor with demonstrated experience in large-scale condenser water system installations" |
| Past performance | Extensive experience installing HVAC systems for industrial and federal buildings Attachment 3 - Statement of Work - Cooling Towers Revision…, page 27: "The Contractor and all Sub-Contractors shall have extensive experience with installing HVAC systems for industrial and federal buildings." |
| Past performance | demonstrated experience in large-scale condenser water system installations, including cooling towe… Attachment 5 - Quality Assurance Surveillance Plan (QASP).p…, page 2: "The work shall be performed by a qualified HVAC/mechanical contractor with demonstrated experience in large-scale condenser water system installations, including cooling tower integration with SCADA systems." |
| Past performance | 7 more in the files, not shown here. |
| Contract type | firm-fixed-price Attachment 5 - Quality Assurance Surveillance Plan (QASP).p…, page 2: "The specific contract type is a Firm-Fixed-Price, in which the Contractor has full responsibility for the performance costs and resulting profit or loss." |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- Attachment 16 M03-vfd plan-BEPVFD.pdf
- Attachment 10 - 75D-07.0-04 EMS Document EHS Contractor Requirements.pdf
- Attachment 29 Chiller Plan Upgrade M-1_recover.pdf
- Attachment 3 - Statement of Work - Cooling Towers Revision 02 Amendment 0002.pdf
- Attachment 28 Chiller Plan Upgrade M-1_120508 Model (1).pdf
- Attachment 14 Evapco performance data.pdf
- Attachment 4 - Pricing Table.pdf
- Attachment 18 Plate and Frame HX Information.pdf
- Attachment 11 - 75D-04.0-11 Fall Protection Procedure.pdf
- Attachment 8 - Site Visit Sign In Sheet.pdf
- Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf
- Attachment 19 Structural Support for VFDs.pdf
- Attachment 3 - Statement of Work - Cooling Towers.pdf
- 2031ZA26R00027.pdf
- Attachment 21 BEP-E1R613 Model Chiller Plant Electrical.pdf
- Attachment 31 Pictures.pdf
- Attachment 17 M04-Cooling Tower piping plan-BEPVFD M-4.pdf
- Attachment 25 ax-dcm-06 Main Roof Top.pdf
- Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf
- Attachment 20 Tower_submittal.pdf
- Attachment 1 - Past Performance Questionnaire.pdf
- Attachment 6 - Initial Staffing Plan.pdf
- 2031ZA26R00027 0001.pdf
- Attachment 4 - Pricing Table Revision 01 Amendment 0002.pdf
- Attachment 7 - Monthly Workforce Report.pdf
- Attachment 27 ax-dca-09 Annex Roof Top.pdf
- Attachment 22 BEP-E2R0613 Layout1 Chiller Plant Electrical 2.pdf
- Attachment 32 Pictures.pdf
- Attachment 24 Cooling Tower Information BEP Chilled Water Plant.pdf
- Attachment 12 75D-04.0-01 Emergency Action and Fire Prevention Plan.pdf
- 2031ZA26R00027 Revision 01 11052026.pdf
- Attachment 30 Pictures.pdf
- Attachment 26 M-DCA-09-1001023-HV.pdf
- Attachment 15 M02-schematic-BEPVFD Model Chiller Planty Flow Schematic mechanical 2.pdf
- 2031ZA26R00027 0003.pdf
- Attachment 23 BEP-M1R613 w chiller Layout1.pdf
- 2031ZA26R00027 0002.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | September 15, 2026 | October 9, 2026, 1:00 PM ET |
| Solicitation | October 7, 2026 | November 9, 2026, 1:00 PM ET |
| Solicitation | November 4, 2026 | December 11, 2026, 1:00 PM ET |
| Solicitation | November 11, 2026 | December 11, 2026, 1:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.