Modernize Regenerative Thermal Oxidizer (RTO)

Closed. Responses were due November 25, 2026, 4:00 PM ET.

Solicitation number2031ZA27B00001
Notice typeSources Sought
AgencyTREASURY, DEPARTMENT OF THE, BUREAU OF ENGRAVING AND PRINTING, OFFICE OF THE CHIEF PROCUREMENT OFFICER
Set-asideNot listed
NAICS238220 Plumbing, Heating, and Air‑Conditioning Contractors
SBA size standard: $19M average annual receipts
Product or service codeZ2AZ Repair or Alteration of Other Administrative Facilities and Service Buildings
Place of performanceTX - Texas, TX 76131, USA
PostedNovember 17, 2026
Response dueNovember 25, 2026, 4:00 PM ET

Who holds the work now

USAspending shows no current award in NAICS 238220 at the Bureau of Engraving and Printing, and this notice names no contract we hold.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 2031ZA27B00001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

SEEKING SOURCES ONLY - The Bureau of Engraving and Printing (BEP) Western Currency Facility (WCF) is located at 9000 Blue Mound Road, Fort Worth, TX, 76131. Construction began on the WCF in 1987 and was completed in 1989. The Modernized Regenerative Thermal Oxidizer (RTO) is an air pollution control device that is required by the NSR (New Source Review) Air Permit issued by the TCEQ (Texas Commission on Environmental Quality) to treat Volatile Organic Compounds (VOC) emissions from Plate Printing presses (14), Offset presses (4), and Rotary Screen presses (4). The existing RTO was commissioned in 2010 to control VOC emissions from Plate Printing. In 2021, the Offset presses were added to the RTO system. The existing conveyance system, which currently includes ducting from each press to the roof, nine (9) roof fans, and a 48" main duct on the roof, has been in place since the facility was built in the early 90s. The system has been cobbled together as presses were added in Plate Printing, which originally only housed four (4) presses, without consideration for the wholistic efficiency of the system. It is a requirement of the Clean Air Act, EPA regulations, and the WCF air permits, that an air pollution control device associated with a "facility" (equipment or area that is emitting air pollutants as defined by EPA) must be maintained in good condition and operated properly while the attached "facilities" operate. This design/build project shall replace the RTO and the associated exhaust ventilation system: a new RTO with a modern control panel including safe PLCs and lower working voltage, a properly designed exhaust ventilation system that self-optimizes with feedback from modern performance-monitoring systems, properly sized roof fans, accessibility to clean ducting where needed, and increased voe capture efficiency to better exhaust printing areas while allowing the RTO to operate using less supplemental fuel. The new system shall also incorporate features to decrease the amount of ink and oils that get conveyed into the exhaust ventilation system causing air flow issues and damaging ducting, fans, and other system components. Natural gas usage of the new RTO shall be metered and integrated into the BEP Supervisory Control And Data Acquisition (SCADA) system. In 2025, the existing RTO underwent several upgrades including the installation of a new, modern control panel to address obsolete components and increasingly difficult troubleshooting. This project shall set the Western Currency Facility (WCF) up for success in providing operational redundancy alongside the newly overhauled RTO that is currently operating at the facility. The entire voe exhaust ventilation system shall feed into one of two RTOs (existing or new) with the capability to divert process flow from one RTO to the other in the event one RTO shuts down for any reason. This redundancy shall enable production to continue operating while the root cause of the issue is addressed.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Sources SoughtNovember 17, 2026November 25, 2026, 4:00 PM ET