Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana

Open. No response date is listed. Check the notice text for how and when to respond.

Solicitation number69056726R000017
Notice typePresolicitation
AgencyTRANSPORTATION, DEPARTMENT OF, FEDERAL HIGHWAY ADMINISTRATION, 690567 WESTERN FEDERAL LANDS DIV
Set-asideNot listed
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeY1LB Construction of Highways, Roads, Streets, Bridges, and Railways
Place of performanceYellowstone National Park, WY, USA
PostedJuly 19, 2026
Response dueNot listed

Who holds the work now

Largest current award in NAICS 237310 at the Federal Highway Administration, by dollars obligated: FORT MYER CONSTRUCTION CORP, current end date December 31, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 69056726R000017 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

Update 07/20/2026: Preliminary letter posted to attachments. PROJECT: WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and Montana LOCATION: The project work is located in 5 National Park sites: Devils Tower National Monument (DETO), Fossil Butte National Monument (FOBU), Grand Teton National Park (GRTE) and John D. Rockefeller JR Memorial Parkway (JODR) in Wyoming; and Grant-Kohrs National Historic Site (GRKO) in Montana. The approximate latitude and longitude coordinates for the project are: • DETO: 44°35'25.54"N, 104°43'11.57"W • FOBU: 41°50'11.57"N, 110°46'18.18"W • GRTE: 43°39'17.20"N, 110°43'3.69"W • JODR: 44° 6'23.93"N, 110°39'55.82"W • GRKO: 46°24'19.96"N, 112°44'9.50"W WORK: This project consists of pavement preservation and parking lot rehabilitation. See “Project Description” and preliminary plans posted under Attachments for additional details. LENGTH: Base- 57.45 miles and parking areas Option X- 15 miles Option Y- 0.62 miles and parking areas Option Z- 0.61 miles TENTATIVE COMPLETION DATE: Fall 2027 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 10,000,000 and $20,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Western Region Pavement Preservation MATOC. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region-pavement-pres This project is anticipated to be solicited Fall 2026. There will be a Base schedule plus 3 Options. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationJuly 15, 2026
PresolicitationJuly 19, 2026
PresolicitationJuly 19, 2026

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.