Notices · Solicitation
Research Initiatives in Support of FHWA Next Generation Structural Materials and Systems
Open. Responses are due in 856 days, on April 1, 2029, 1:30 PM ET.
| Solicitation number | 693JJ3-24-BAA-0003 |
|---|---|
| Notice type | Solicitation |
| Agency | TRANSPORTATION, DEPARTMENT OF, FEDERAL HIGHWAY ADMINISTRATION, 693JJ3 ACQUISITION AND GRANTS MGT |
| Set-aside | Not listed |
| NAICS | 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) SBA size standard: 1,000 employees (SBA footnote 11); exception for Aircraft, Aircraft Engine and Engine Parts: 1,500 employees (SBA footnote 11); exception for Other Aircraft Parts and Auxiliary Equipment: 1,250 employees (SBA footnote 11); exception for Guided Missiles and Space Vehicles, Their Propulsion Units and Propulsion Parts: 1,300 employees (SBA footnote 11) |
| Product or service code | AS12 Transportation R&D Services; Surface Transportation, Public Transit, and Rail; Applied Research |
| Place of performance | DC 20590, USA |
| Posted | November 13, 2025 |
| Response due | April 1, 2029, 1:30 PM ET |
Who holds the work now
Largest current award in NAICS 541715 at the Federal Highway Administration, by dollars obligated: LEIDOS, INC., current end date January 21, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 693JJ3-24-BAA-0003 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
Amendment 0001: The purpose of this amendment is to update the Broad Agency Announcement in accordance with agency priorities and the Revolutionary Federal Acquisition Regulation Overhaul (RFO) (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-17). The Federal Highway Administration (FHWA) Office of Infrastructure Research and Development (HRDI) Bridge Engineering Research Team is announcing its intent to solicit white papers and proposals under this Broad Agency Announcement (BAA). This BAA is developed in accordance with Federal Acquisition Regulation (FAR) 6.101(b)(3)(ii) and FAR 35.102. This BAA involves the use of a 5-year Open BAA to quickly and efficiently execute research and development to deliver practical solutions to high priority problems. This strategy will provide FHWA an acquisition tool with the flexibility to solicit white papers and proposals and make awards that meet present and compelling needs. White papers and proposals will only be solicited and accepted during individual calls. Calls for white papers and proposals will occur periodically throughout the life of the BAA. Each call will identify: (1) specific topic areas; (2) any changes to the standard evaluation criteria or white paper and/or proposal preparation instructions, and; (3) cutoff dates for submissions. The FHWA HRDI Bridge Engineering Research Team conducts and directs research efforts in support of the development of testing standards, structural design and construction specifications, and acceptance criteria. The FHWA HRDI Bridge Engineering Research Team leads the development and advancement of next generation structural materials and systems, and provides leadership in the development of standards, specifications, and acceptance criteria to enable their deployment. The work conducted generally enables the advancement of state-of-the-art solutions and positions HRDI as a leader in the deployment of such technologies to maintain or improve the safety, integrity, durability, and resilience of the Nation’s bridges and highway structures. The primary purpose of this BAA is to solicit a variety of solutions that will support the FHWA Bridge Engineering Research Team program areas: Structural Steel, Structural Concrete, Geotechnical Structures, and Bridge Hydraulics. Projects shall develop next generation technologies and solutions that address FHWA’s strategic goals. FHWA’s new strategic plan and associated goals for 2026-2030 is expected to be published February 2026 (https://www.transportation.gov/dot-strategic-plan).
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | April 1, 2024 | April 1, 2029, 1:30 PM ET |
| Solicitation | July 10, 2024 | April 1, 2029, 1:30 PM ET |
| Solicitation | July 10, 2024 | April 1, 2029, 1:30 PM ET |
| Solicitation | November 13, 2025 | April 1, 2029, 1:30 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.