Notices · Solicitation
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
Open. Responses are due in 7 days, on December 4, 2026, 5:00 PM ET.
| Solicitation number | 6973GH-27-R-00005 |
|---|---|
| Notice type | Solicitation |
| Agency | TRANSPORTATION, DEPARTMENT OF, FEDERAL AVIATION ADMINISTRATION, 6973GH FRANCHISE ACQUISITION SVCS |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237110 Water and Sewer Line and Related Structures Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1ND Construction of Sewage and Waste Facilities |
| Place of performance | Oklahoma City, OK 73169, USA |
| Posted | November 25, 2026 |
| Response due | December 4, 2026, 5:00 PM ET |
Who holds the work now
Largest current award in NAICS 237110 at the Federal Aviation Administration, by dollars obligated: CMP COMMERCIAL CONSTRUCTION INC, current end date November 15, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 6973GH-27-R-00005 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
From the attachments
Pulled by AI from 10 of 29 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
| Evaluation | lowest price technically acceptable 6973GH-27-R-00005.pdf, page 64: "This acquisition will utilize Lowest Price Technically Acceptable for an award decision, therefore an offeror must receive" |
|---|---|
| Evaluation factors | Factor 1 - Relevant Experience; Factor 2 - Past Performance; Factor 3 - Key Personnel; Factor 4 - P… 6973GH-27-R-00005.pdf, page 65: "Factor 1 - Relevant Experience: Demonstrate the experience of offeror and/or proposed team, including sub-" |
| Questions due | November 4, 2026 6973GH-27-R-00005.pdf, page 63: "Offerors are encouraged to submit all questions they may have regarding this requirement/specifications/plans in writing to the Contracting Officer no later than Wednesday, November 4, 2026." |
| Questions due | November 9, 2026 Amend 0002 6973GH-27-R-00005.pdf, page 2: "the Contracting Officer no later than Monday, November 9, 2026." |
| Site visit | November 2, 2026, mandatory 6973GH-27-R-00005.pdf, page 63: "Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visit to be held at 10:00 a.m. Central Time, Monday, November 2, 2026" |
| Site visit | November 2, 2026 Site Visit Attendance Log IWTP 27-R-00005.pdf, page 1: "Site Visit Date: November 2, 2026 / 1000" |
| Bonding | Proposal guarantee of 20% 6973GH-27-R-00005.pdf, page 26: "The required amount of the proposal guarantee is 20%." |
| Bonding | Performance bond in a penal amount equal to 100 percent of the contract price 6973GH-27-R-00005.pdf, page 26: "The contractor is required to submit a performance bond in a penal amount equal to 100 percent of the contract price" |
| Bonding | Payment bond in the penal amount of 100% of the original contract price 6973GH-27-R-00005.pdf, page 26: "The contractor is required to submit a payment bond in the penal amount of 100% of the original contract price" |
| Past performance | five (5) years experience in the installation of specified materials on comparable projects Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_20…, page 155: "The joint sealant work shall be performed by a firm having five (5) years experience in the installation of specified materials on comparable projects." |
| Past performance | record of successful in-service performance Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_20…, page 106: "Manufacturer's Qualifications: Employs skilled workers who custom fabricate products similar to those required for this Project and whose products have a record of successful in-service performance." |
| Past performance | Manufacturers: minimum five (5) years documented experience producing similar hardware and equipment Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_20…, page 198: "Engage qualified manufacturers with a minimum five (5) years of documented experience in producing hardware and equipment similar to that indicated for this Project" |
| Past performance | 3 more in the files, not shown here. |
| Contract type | firm-fixed-price 6973GH-27-R-00005.pdf, page 4: "This is a Firm-Fixed Price Contract." |
The notice text
The text below is SAM.gov's own, unedited.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.
- Attachment 8 Contractor Release.pdf
- Attachment 13 Key Personnel Experience Form 11.25.26.pdf
- Attachment 3 SF25A Payment Bond.pdf
- Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_2026 06 10.pdf
- 6973GH-27-R-00005.pdf
- Attachment 6 Past Performance Experience Form 9.21.26.docx
- Site Visit Attendance Log IWTP 27-R-00005.pdf
- Amend 0002 6973GH-27-R-00005.pdf
- Informational File 2 Asbestos Survey 190-CLS.pdf
- Informational File 4 Historic Plans-Information Purposes Only.pdf
- Attachment 1a FAA MMAC IWTP_Specifications_IFC Volume I Rev 2026 09 29.pdf
- Attachment 5 Past Performance Survey 9.21.26.docx
- Attachment 10 Chapter 33 Construction Safety.pdf
- Attachment 10 Chapter 33 Construction Safety Rev 11.23.26.pdf
- QA Log 2 11.25.26.pdf
- QA Log 1 11.23.26.pdf
- Attachment 7 Client Authorization Letter.docx
- Attachment 11 Davis-Bacon Act WD-OK20260049.pdf
- Attachment 4 SF24 Bid Bond.pdf
- Attachment 12 MMAC Delivery Truck Route Roads.pdf
- Informational File 1 Asbestos Survey 186-IWT.pdf
- Amend 0001 6973GH-27-R-00005.pdf
- Amend 0004 6973GH-27-R-00005.pdf
- Amend 0005 6973GH-27-R-00005.pdf
- Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10.pdf
- Informational File 3 Lead Based Paint Readings 186-IWT XRF.pdf
- Attachment 2 SF25 Performance Bond.pdf
- Attachment 9 AMP400-ENV-OC-2.4.3-CC.pdf
- Attachment 1d 13289-007_MMAC IWTP Drawings.pdf
- Amend 0003 6973GH-27-R-00005.pdf
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | October 19, 2026 | November 19, 2026, 5:00 PM ET |
| Solicitation | October 20, 2026 | November 19, 2026, 5:00 PM ET |
| Solicitation | November 1, 2026 | November 19, 2026, 5:00 PM ET |
| Solicitation | November 3, 2026 | November 19, 2026, 5:00 PM ET |
| Solicitation | November 15, 2026 | November 30, 2026, 5:00 PM ET |
| Solicitation | November 23, 2026 | November 30, 2026, 5:00 PM ET |
| Solicitation | November 25, 2026 | December 4, 2026, 5:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.