Notices · Solicitation
ND NP THRO 204(1) Buck Hill Road
Closed. Responses were due November 3, 2026, 4:00 PM ET.
| Solicitation number | 6982AF25B000004 |
|---|---|
| Notice type | Solicitation |
| Agency | TRANSPORTATION, DEPARTMENT OF, FEDERAL HIGHWAY ADMINISTRATION, 6982AF CENTRAL FEDERAL LANDS DIVISI |
| Set-aside | None (full and open competition) |
| NAICS | 237310 Highway, Street, and Bridge Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways |
| Place of performance | Medora, ND, USA |
| Posted | November 2, 2026 |
| Response due | November 3, 2026, 4:00 PM ET |
Who holds the work now
Largest current award in NAICS 237310 at the Federal Highway Administration, by dollars obligated: FORT MYER CONSTRUCTION CORP, current end date December 31, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 6982AF25B000004 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
INVITATION FOR BID (IFB) FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE PROJECT NUMBER: ND NP THRO 204(1) PROJECT NAME: Buck Hill Road PROJECT DESCRIPTION: Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options. SCOPE OF THE WORK: The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot. The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage. The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area. Buck Hill Road may be closed for the duration of construction. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement – October 2026 Award - January 2027 Construction – April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
Attachments
SAM.gov lists 22 files with this notice. Open them on SAM.gov, or ask Claude to read them.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | September 30, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | October 6, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | October 13, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | October 26, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | October 28, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | November 1, 2026 | November 3, 2026, 4:00 PM ET |
| Solicitation | November 2, 2026 | November 3, 2026, 4:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.