AZ BL COLO 7528(1) Burro Creek Road
Closed. Responses were due November 17, 2026, 4:00 PM ET.
| Solicitation number | 6982AF27B000002 |
|---|---|
| Notice type | Solicitation |
| Agency | TRANSPORTATION, DEPARTMENT OF, FEDERAL HIGHWAY ADMINISTRATION, 6982AF CENTRAL FEDERAL LANDS DIVISI |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 237310 Highway, Street, and Bridge Construction SBA size standard: $45M average annual receipts |
| Product or service code | Y1LB Construction of Highways, Roads, Streets, Bridges, and Railways |
| Place of performance | Kingman, AZ 86401, USA |
| Posted | November 19, 2026 |
| Response due | November 17, 2026, 4:00 PM ET |
Who holds the work now
Largest current award in NAICS 237310 at the Federal Highway Administration, by dollars obligated: FORT MYER CONSTRUCTION CORP, current end date December 31, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 6982AF27B000002 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Attachments
SAM.gov lists 13 files with this notice. Open them on SAM.gov, or ask Claude to read them.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Solicitation | October 14, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | October 14, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | October 26, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | November 4, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | November 11, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | November 16, 2026 | November 17, 2026, 4:00 PM ET |
| Solicitation | November 19, 2026 | November 17, 2026, 4:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.