CO NP ROMO 407(1) Holzwarth Culvert

Closed. Responses were due October 27, 2026, 4:00 PM ET.

Solicitation number6982AF27B000004
Notice typeSolicitation
AgencyTRANSPORTATION, DEPARTMENT OF, FEDERAL HIGHWAY ADMINISTRATION, 6982AF CENTRAL FEDERAL LANDS DIVISI
Set-asideNone (full and open competition)
NAICS237310 Highway, Street, and Bridge Construction
SBA size standard: $45M average annual receipts
Product or service codeY1LB Construction of Highways, Roads, Streets, Bridges, and Railways
Place of performanceGrand Lake, CO 80447, USA
PostedOctober 26, 2026
Response dueOctober 27, 2026, 4:00 PM ET

Who holds the work now

Largest current award in NAICS 237310 at the Federal Highway Administration, by dollars obligated: FORT MYER CONSTRUCTION CORP, current end date December 31, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 6982AF27B000004 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68” dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – December 2026 NTP – December 2026 Contract Completion – November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.

Attachments

SAM.gov lists 13 files with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationSeptember 15, 2026October 20, 2026, 4:00 PM ET
SolicitationOctober 18, 2026October 27, 2026, 4:00 PM ET
SolicitationOctober 19, 2026October 27, 2026, 4:00 PM ET
SolicitationOctober 26, 2026October 27, 2026, 4:00 PM ET