Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Z2DZ--Project Number 653-105, Seismic Retrofit of Building 16, Roseburg VAMC, Oregon

Closed. Responses were due October 2, 2026, 4:00 PM ET.

Solicitation number36C10F26R0084
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)
Set-asideNot listed
NAICS236220 Commercial and Institutional Building Construction
SBA size standard: $45M average annual receipts
Product or service codeZ2DZ Repair or Alteration of Other Hospital Buildings
Place of performanceNot listed
PostedNovember 9, 2026
Response dueOctober 2, 2026, 4:00 PM ET

Who holds the work now

Largest current award in NAICS 236220 at the Department of Veterans Affairs, by dollars obligated: WALSH CONSTRUCTION COMPANY II, LLC, current end date March 25, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C10F26R0084 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND EVALUATION CRITERIA DESCRIPTION OF WORK This Request for Proposal (RFP) solicits for a single Firm-Fixed-Price (FFP) Contract to construct the Seismic Retrofit and Renovate B16 project at the Roseburg VAMC campus in Oregon. The project is in Building 16 which houses the chapel/auditorium on the Roseburg VAMC campus. This project includes a full seismic retrofit of the 16,569 square foot (GSF) building. The Contractor will provide all labor, materials and equipment for the demolition and construction services needed to complete this project. All work will meet SOW, drawings, and specification requirements as well as any applicable manufacturer s recommended installation procedures. GENERAL INSTRUCTIONS This requirement will be advertised for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture. All proposals shall be submitted electronically, except for the Bid Bond. All submissions shall be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission. Title the file(s) in the following format: 36C10F26R0084_COMPANY NAME_ VOLUME I 36C10F26R0084_COMPANY NAME_ VOLUME II Submit proposals electronically via email to the following: 003C4C.acquisitions@va.gov SUBMITTAL OF OFFERS: Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's experience and capability, past performance, and use of small business necessary for successful completion of the project. Requirements stated in this RFP are minimums. The Offeror s conformance with the specified format, submission requirements, and the Offeror s attention to detail will be considered during the technical evaluation and trade-off. Material omission(s) may result in a deficiency, which may cause the technical proposal to be rejected as unacceptable. Technical proposals that do not provide the specified information in the specified location in accordance with the submission instructions may be found to have weaknesses or significant weaknesses. The Government is under no obligation to search for information that is not in the specified location. Responses that are essentially blanket offers of compliance are not adequate substitutes for the detailed and complete technical information necessary to establish that an Offeror can meet Government needs. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The Offeror s failure to include information that the Government has indicated should be included may result in the proposal being assigned a (significant) weakness and/or being found deficient if inadequate detail is provided. Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the Offeror s failure to comply with the submission instructions. Exceptions. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer. Restrictions on Offeror-Provided Information. Confidential projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror s technical proposal. Confidential Project is defined as projects containing confidential information of which reasonably could be expected to cause damage to the national security with the unauthorized disclosure. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, Instructions to Offeror Competitive Acquisition , paragraph (e), Restriction on disclosure and use of data. Files shall not contain classified data. PROPOSAL FORMAT General Proposal Format: ALL Volumes shall contain: Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal. Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices. Tabs. Proposals shall be organized and tabbed in accordance with the tabbing per Phase and Volume. All Volumes shall be formatted as follows: Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated. Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (i.e. 36C10F26R0084_Company_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal. Proposal Formatting: VOLUME I (Contract Requirements): TAB A Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal. TAB B Proposal Pricing Schedule. TAB C Representations and Certifications. TAB D Proposal Data Sheet See Attachment 3 provided in the solicitation. Offerors should ensure telephone number, fax number, e-mail address and Unique Entity ID are all included. The Unique Entity ID provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate ID has been created for a joint venture it must also be submitted. The Offeror shall also submit its Tax ID number on the proposal data sheet. TAB E - Bid Bond The Offeror is required to submit a bid bond for this project. This is to be submitted in original form and sent to the Contracting Office with an electronic copy included here in Tab D. Submit originals; photocopied or scanned copies are not acceptable. FAR clause 52.228-1, Bid Guarantee will be included in the contract. TAB F Joint Venture Agreement, if applicable. VOLUME II (Technical- Requirements): TAB G FACTOR 1 Organization/Technical Approach & Schedule TAB H FACTOR 2 Past Performance of the Offeror s Team TAB I FACTOR 3 Key Personnel SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA Volume II, Tab G Factor 1 Organizational/Technical Approach & Schedule: 1.1 Provide information that describes the Offeror's organization and intended technical approach to executing the contract per the detailed requirements of the solicitation. Offerors are limited to 30 pages total for this factor. Any pages submitted beyond this limit will be removed and will not be read or given any consideration. Offerors should clearly but concisely describe the organizational and technical approach to project management and execution. 1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that will be established. Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including construction activities for each major feature. The Offeror should identify any specific firms chosen as subcontractors for electrical, structural, mechanical, etc; or indicate self-performance. If the Offeror intends to subcontract out any separate work types, identify the subcontractor. In order for a firm other than the Offeror to contribute to the Offeror s organizational approach, document unequivocal teaming arrangements with subcontractors. Describe the proposed management structure for the team, how the construction process will be managed and the authorities and the delegations of authority within the team. Include a chart illustrating the organization including the proposed quality control group(s). Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, and their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart and with the matrix of responsibilities assigned to the team firms. 1.3 Technical Approach for Construction: Describe the approach for the full scope of work in the contract. Describe the role and interaction of the construction team during construction, addressing elements such as schedule management, material/equipment delivery and management, labor management, cost management, site security and personnel assurance system management, progress meetings, documentation and quality control. 1.3.1 Describe quality control procedures during construction. Include description of quality control inspection and submittal register control. 1.3.2 As per FAR 52.236-1, the contractor shall perform on the site, and with its own organization, work equivalent to at least 20% of the total amount of work to be performed under the contract. 1.3.3 Proposed Contract Duration and Summary Schedule: The Offeror shall submit a summary level schedule for construction with details for all major activities. The number of calendar days should be included for each activity. The Offeror shall also include their proposed contract duration in this summary level schedule, which shall not exceed the maximum contract duration specified in the solicitation. It is the Offeror s responsibility to schedule the work considering all constraints of the project. This summary schedule will, after contract award, be replaced with a project schedule as required by the specifications. The schedules should be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. The proposed project schedule shall reflect the proposed contract duration and phasing requirements as indicated within the Scope of Work (SOW). 1.4 Source Selection Evaluation Criteria for Factor 1 Organizational/Technical Approach & Schedule: 1.4.1 The Government will evaluate the firm s understanding and capability to execute the project, as well as compliance w/ the percentage of work to be performed by the contractor as per FAR 52.236-1. Some additional specific evaluation considerations are listed below. 1.4.2 Organizational Approach: The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured and staffed to execute the entire scope of work. Joint venture participant s contribution to the organization should be commensurate with their skills and background. 1.4.3 Technical Approach for Construction:

The rest of the text is on SAM.gov.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationJuly 20, 2026August 10, 2026, 6:00 PM ET
PresolicitationNovember 9, 2026August 10, 2026, 6:00 PM ET
SolicitationNovember 9, 2026October 2, 2026, 4:00 PM ET
SolicitationNovember 9, 2026December 10, 2026, 4:00 PM ET
SolicitationNovember 9, 2026October 2, 2026, 4:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.