Notices · Combined Synopsis/Solicitation
J061--Eaton Powerware System Replacement
Open. Responses are due in 3 days, on November 30, 2026, 5:00 PM ET.
| Solicitation number | 36C24127Q0030 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF, 241-NETWORK CONTRACT OFFICE 01 (36C241) |
| Set-aside | Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC) |
| NAICS | 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance SBA size standard: $12.5M average annual receipts |
| Product or service code | J061 Maint/Repair/Rebuild of Equipment- Electric Wire and Power Distribution Equipment |
| Place of performance | Manchester, NH 03104, USA |
| Posted | November 23, 2026 |
| Response due | November 30, 2026, 5:00 PM ET |
Who holds the work now
Largest current award in NAICS 811310 at the Department of Veterans Affairs, by dollars obligated: INNOVATION ASSOCIATES, INC., current end date August 27, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 36C24127Q0030 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
36C24127Q0030 UPS Eaton Powerware System Replacement - RFIs Does the VA require technicians performing quarterly and annual preventive maintenance to be individually factory-certified or authorized by Eaton? Due to the complex nature of the product and criticality - Yes Will documented experience and technical qualifications satisfy the qualification requirement for routine preventive maintenance? See answer to RFI 1 Is direct access to Eaton's proprietary field-service software mandatory for the prime contractor, or may that requirement be fulfilled through an Eaton-authorized service provider supporting specific procedures? Prime Contractor does not require that; That portion can be filled through an Eaton Authorized Technician. Would a contractor be considered technically acceptable if it performs routine maintenance using qualified technicians and subcontracts manufacturer-restricted procedures and startup to Eaton? Yes, minor PM work such as filter changes etc. would be outside the requirement of needing an Eaton Technician. Since Eaton has discontinued the 93E product line, will the VA accept the current Eaton 93PM or another equivalent replacement system meeting the required performance specifications? The VA would accept an Eaton alternative. The goal of the project is to replace existing equipment in-kind with newer model. Does the existing Eaton Powerware 9390 system have an external maintenance bypass (for example, a maintenance bypass panel or a bypass sidecar with maintenance bypass and isolation breakers)? Yes, See photos. Is the replacement expected to include a maintenance bypass sidecar, such as the Eaton 93E 60 kVA bypass sidecar shown in Attachment A, or is it limited to the UPS and Extended Battery Cabinet listed in SOW Section 3.5? The UPS is required to be able to go into maintenance Bypass and maintain power to the computer room during maintenance. What is the kVA rating of the existing unit? The SOW says "Model 80," but the replacement is specified at 60 kVA. Existing UPS is 80KVA. The goal is to replace-in- kind. The 60kVA was utilized as a basis of design. What are the existing input voltage and output voltage? Current system: Eaton Powerware 9390-80 Model 80 AC IN: 208VAC 3W 60Hz 3Phase 240A AC OUT: 208VAC 4W 60Hz 3Phase 222A 78KW 80KVA BYPASS: 208VAC 4W 60Hz 3Phase 222A 80KVA DC: 384-480Vdc 204A Please provide a photo of the existing unit's data plate. See attached photos Please provide photos of the full system (standing back) and of the battery cabinet and batteries. See attached photos Please confirm the battery quantity and model: 40 x Hitachi Chemical Energy Technology 12V 540W, HRC12540WP. Confirmed What is the current battery run time, and what run time is required for the replacement? 60 minutes would it be possible to forward the latest performance specifications/Source Control Drawings for the Powerware System attached Will the VA be paying invoices on a Net-30/45/60 schedule? The VA approves all invoices within 15 days and funds are transferred within 30 days of receipt.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | November 3, 2026 | November 26, 2026, 5:00 PM ET |
| Combined Synopsis/Solicitation | November 9, 2026 | November 26, 2026, 5:00 PM ET |
| Combined Synopsis/Solicitation | November 17, 2026 | November 30, 2026, 5:00 PM ET |
| Combined Synopsis/Solicitation | November 23, 2026 | November 30, 2026, 5:00 PM ET |
| Combined Synopsis/Solicitation | November 23, 2026 | November 30, 2026, 5:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.