Notices · Special Notice
J041--Chiller System Maintenance
Closed. Responses were due November 25, 2026, 12:00 PM ET.
| Solicitation number | 36C24127Q0080 |
|---|---|
| Notice type | Special Notice |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF, 241-NETWORK CONTRACT OFFICE 01 (36C241) |
| Set-aside | Not listed |
| NAICS | 238220 Plumbing, Heating, and Air‑Conditioning Contractors SBA size standard: $19M average annual receipts |
| Product or service code | J041 Maint/Repair/Rebuild of Equipment- Refrigeration, Air Conditioning, and Air Circulating Equipment |
| Place of performance | Not listed |
| Posted | November 18, 2026 |
| Response due | November 25, 2026, 12:00 PM ET |
Who holds the work now
Largest current award in NAICS 238220 at the Department of Veterans Affairs, by dollars obligated: BLUEWAY ONE JV LLC, current end date February 23, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 36C24127Q0080 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement: STATEMENT OF WORK SCOPE OF WORK The Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation. Period of Performance: This will be a firm-fixed price, base year plus four option years task order. DEFINITIONS/ACRONYMS Contract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future. Contracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract. Contracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor. Preventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications. Repair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance. Time: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays. Rework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government. ESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract. Acronyms. Commonly used acronyms are listed below FSE: Field Service Engineer AQL: Acceptable Quality Level IAW: In Accordance With QA: Quality Assurance QC: Quality Control WS: Performance Work Statement VA: VA Medical Center CO: Contracting Officer COTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service PREVENTIVE MAINTENANCE REQUIREMENTS Within 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit. The following is the scope of services to be performed on Covered Equipment. Items marked with an X are included in this contract. Services Included Cooling Seasonal Service Services Included Heating Seasonal Service X Seasonal Start-up Seasonal Start-up X Operating Inspections Qty Operating Inspections Qty X System Shutdown System Shutdown X Annual Seasonal Maintenance Annual Seasonal Maintenance Services Included Labor and Materials for Covered Equipment X Scheduled Maintenance Labor X Scheduled Maintenance Parts and Materials X Repair Labor: Repairs will be performed on covered equipment during Trane regular business hours Select Agreement Repair Parts and Materials Select Agreement X Overtime Repair Labor for Emergency Failures (outside Trane regular business X Refrigerant Monitor Inspection. Testing and Calibration once per year Refrigerant Replacement 0% of Charge per unit per year X Refrigerant Usage Reporting Other Services Included Predictive Testing and Analysis for Covered Equipment Chiller(s) Only X Spectrographic Oil Analysis Trending oil analysis provides insight into potential X Refrigerant Analysis Provides early warning of internal failure X KestrelView Analysis Requires Trane laptop and Trane software X Oil Removal and Disposal by Trane in accordance with EPA Guidelines X Oil Change Services Included Additional Services X Air-cooled condenser coil cleaning once per year X Clean Cooling Tower(s) once per year X Condenser Tube Cleaning & Evap Tube Cleaning once per year X Starter Maintenance 600 volt volt starter X Eddy Current Test of tubes every 2 years Other Chiller overhaul every 5 years was included in the current contract SOW Equipment Maintenance Procedures: TRANE CENTRIFUGAL CHILLERS (Low Pressure Units) COMPREHENSIVE ANNUAL INSPECTION SERVICE TRANE CTV-512 Report in with the COTR and sign log with name, date and time. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly Inspect for leaks and report leak check results to the customer. Provide reports at the end of each visit. Repair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit. Calculate refrigerant loss rate and report to COR. Provide report at end of each visit. Replace the filter / drier on the motor cooling line, in accordance with mfg specifications. Test the security of mounting points; tighten all major points. Controls and Safeties Inspect control panel for cleanliness. Inspect wiring and connections for tightness and signs of overheating and discoloration. Verify the working condition of all indicator/alarm lights. Verify the operation of all timing devices. Verify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR. Verify the operation of the low oil temperature safety device. Calibrate and record setting. Test the high discharge pressure safety device. Calibrate and record setting. Test the high suction temperature switch. Calibrate and record setting. Test the high discharge temperature safety device. Calibrate and record setting. Test the low suction pressure safety device. Calibrate and record setting. Test the low pressure override switch. Calibrate and record setting. Test the low leaving water temperature control device. Calibrate and record setting. Lubrication System Pull oil sample for spectroscopic analysis. Change oil Test oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test. Inspect oil pump motor terminals for tightness and signs of overheating and discoloration. Measure and record oil pump motor voltage and amperage. Verify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater. Motor and Starter Clean the starter and cabinet. Inspect the wires and starter components for tightness and signs of overheating and discoloration. Verify the operation of the transition/system timer. Check the condition of the contacts for wear and pitting. Check the contactors for free and smooth operation. Check the mechanical linkages for wear, security, and clearances. Verify the operation of the electrical interlocks. Check the dash pots oil for level, rust, and/or moisture. Meg the motor and record readings. Check the motor terminals for cracks and/or leaks. Measure voltage and record reading. Voltage should be nominal voltage ±10%. STARTUP / CHECKOUT PROCEDURE CTV-520 Verify the operation of the oil heater and that the oil temperature is at least 110°F before starting the chiller. Verify full water systems, including the cooling tower, the condenser and the evaporator. Verify clean cooling tower and strainers. Start the condenser water pump, chilled water pump, and cooling tower fan(s). Verify flow rates through the condenser and the evaporator. Test all flow-proving devices on the chilled water and condenser water circuits. Start the chiller. Verify the starter operation. Verify the operation of all timing devices. Check the load limit relay for set point, hunting, and unloading capability. Check the mechanical limits on both vane arms. Verify smooth movement of vane arms. Check the set point and sensitivity of the chilled water temperature control device. Verify the operation. Verify the operation of the condenser water temperature control device. Verify the motor cooling operation. Shut down the chiller. Check the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.) Re-start chiller and log the operating conditions after the system has stabilized. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. MID-SEASON RUNNING INSPECTION CTV-530 Check the general operation of the unit. Log the operating temperatures, pressures, voltages, and amperages. Check the operation of the purge unit. Check the operation of the control circuit. Check the operation of the lubrication system. Check the operation of the motor and starter. Analyze the recorded data. Compare the data to the original design conditions. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. SEASONAL SHUT-DOWN PROCEDURE CTV-550 Check the general operation of the unit. Shut down the chiller, pumps and auxiliary equipment. Drain the condenser and chilled water piping. Turn off equipment power as necessary. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. CONDENSER CLEANING WATER-COOLED CONDENSERS BRUSH TUBES (600 Tubes/Day) CDS-210 Pull easy end head, both ends Brush tubes. NOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes. LUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130 Change the oil and filter, using factory-recommended oil and filter every year. COOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly STRUCTURE Disassemble all screens and access panels for inspection. Inspect the conditions of the slats. Inspect the condition of the tower fill. Inspect the condition of the support structure. Inspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs to basins and
The rest of the text is on SAM.gov.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Special Notice | November 18, 2026 | November 25, 2026, 12:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.