Notices · Combined Synopsis/Solicitation
W045--Boiler Rental
Closed. Responses were due October 21, 2026, 2:00 PM ET.
| Solicitation number | 36C24227Q0042 |
|---|---|
| Notice type | Combined Synopsis/Solicitation |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF, 242-NETWORK CONTRACT OFFICE 02 (36C242) |
| Set-aside | Not listed |
| NAICS | 238220 Plumbing, Heating, and Air‑Conditioning Contractors SBA size standard: $19M average annual receipts |
| Product or service code | W045 Lease or Rental of Equipment: Plumbing, Heating, and Waste Disposal Equipment |
| Place of performance | Montrose, NY 10548, USA |
| Posted | October 19, 2026 |
| Response due | October 21, 2026, 2:00 PM ET |
Who holds the work now
Largest current award in NAICS 238220 at the Department of Veterans Affairs, by dollars obligated: BLUEWAY ONE JV LLC, current end date February 23, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 36C24227Q0042 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
36C24227Q0042 Mod 2 Answers to questions submitted: Q1: What is the observed historical peak steam load of the facility? A1: 120,000 lb./hr. Q2: Will the Montrose VAMC waive the requirements of the VHA Safety Device and Testing Manual? A2: No. Q3: Air permits for emissions are the responsibility of the entity operating/generating the emission, not the owner of the equipment. Please clarify. A3: VA only, not the vendor. Q4: Will the VA change the 9PPM NOx requirement to 30 PPM? A4: No. Q5: Please clarify the size of the Boiler. A5: 800 HP Q6: Will fuel for the rental boiler be furnished by the Government of the Contractor? A6: Government Q7: Confirm intended placement and connection routing if boiler placement is on the south end but connections are at the north end? A7: East side of the plant (end near Boiler 1 near Building 24 hazmat storage area) Q8: What is the required installation and ready for service date? A8: Installation 11/1/2026. Ready for service 12/1/2026. Q9. Is a rental unit rated at about 30ppm NOx on natural gas acceptable for the temporary heating period, given that it is a temporary rental operating under the facility s existing permit? A9. Yes Q10. If 9 ppm NOx is mandatory, will the Government accept a unit fitted with flue gas recirculation (FGR) or selective catalytic reduction (SCR) to meet it, and will any additional time be allowed for delivery? A10. The most important factor is that the vendor make the delivery date, so the 9-ppm cis is not a deal breaker. Q11. The requirement lists a 95 PSIG operating pressure but also references 35,000 lb./hr. at 212° F and a 15 PSIG code. What operating pressure should the rental boiler be size for? A11. 95 PSI is sufficient. Q12. Can a portable day tank with a capacity of 10,000 gallons be placed next to the portable boiler in lieu of installing a return line several hundred feet across to the opposite end of the boiler plant? A12. No. ** Please acknowledge all amendments with your response**
Attachments
SAM.gov lists 9 files with this notice. Open them on SAM.gov, or ask Claude to read them.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Combined Synopsis/Solicitation | October 6, 2026 | October 21, 2026, 2:00 PM ET |
| Combined Synopsis/Solicitation | October 7, 2026 | October 21, 2026, 2:00 PM ET |
| Combined Synopsis/Solicitation | October 19, 2026 | October 21, 2026, 2:00 PM ET |
| Award Notice | November 11, 2026 | |
| Award Notice | November 11, 2026 | |
| Award Notice | November 11, 2026 | |
| Award Notice | November 11, 2026 |