Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC

Open. Responses are due in 5 days, on December 2, 2026, 10:00 AM ET.

Solicitation number36C24227R0008
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 242-NETWORK CONTRACT OFFICE 02 (36C242)
Set-asideNot listed
NAICS238220 Plumbing, Heating, and Air‑Conditioning Contractors
SBA size standard: $19M average annual receipts
Product or service codeZ1DA Maintenance of Hospitals and Infirmaries
Place of performanceNot listed
PostedNovember 19, 2026
Response dueDecember 2, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 238220 at the Department of Veterans Affairs, by dollars obligated: BLUEWAY ONE JV LLC, current end date February 23, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C24227R0008 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 7 of 8 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationtradeoff (factors other than price can outweigh price)
36C24227R0008_2.docx: "The Government intends to use the “Best Value” tradeoff process source selection approach in accordance with RFO FAR 12.203."
Evaluation factors(1) Technical, (2) Past Performance, (3) Schedule, and (4) Price
36C24227R0008_2.docx: "with appropriate consideration given to the following evaluation factors: (1) Technical, (2) Past Performance, (3) Schedule, and (4) Price."
Questions dueNovember 16, 2026, 10 AM EDT
36C24227R0008_2.docx: "Questions must be received no later than November 16th, 10 AM EDT."
Questions dueNovember 16, 2026
36C24227R0008 0001.docx: "Could you confirm the intended local Eastern time for the November 9 site visit, November 16 questions deadline, and December 2 proposal deadline?"
Site visitNovember 9, 2026, optional
36C24227R0008_2.docx: "A site visit is scheduled for 10 AM EDT on Monday, November 9th, 2026."
Site visitsee the quote
Final_Specification of Repair Boiler Stack 528A7-18-707.pdf, page 5: "Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer."
Site visitNovember 9, 2026
36C24227R0008 0001.docx: "This amendment posts the sign in sheet for the site visit that occurred on Monday, November 9th, 2026."
BondingBid bond or other financial guarantee with the proposal, and performance or bid bond sufficient to…
36C24227R0008_2.docx: "Offerors are required to include with their proposals a financial guarantee such as a performance or bid bond sufficient to secure the obligations under the proposed Contract."
BondingPerformance & Payment Bonds
Final_Specification of Repair Boiler Stack 528A7-18-707.pdf, page 26: "Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period."
Past performancethree previous similar contracts within the past five years
36C24227R0008_2.docx: "To be evaluated favorably the offeror must provide details of three (3) previous similar contracts within the past five (5) years including:"
Past performancethree (3) projects of similar complexity and dollar value within the last three (3) years
Final_Specification of Repair Boiler Stack 528A7-18-707.pdf, page 213: "The Contractor has conducted within the last three (3) years, three (3) projects of similar complexity and dollar value as this project"
Past performancefour (4) years of abatement experience, two (2) years as Competent Person on the project
Final_Specification of Repair Boiler Stack 528A7-18-707.pdf, page 213: "The Competent Person has four (4) years of abatement experience of which two (2) years were as the Competent Person on the project"
Past performance1 more in the files, not shown here.
Contract typefirm-fixed-price
36C24227R0008_2.docx: "The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation."

The notice text

The text below is SAM.gov's own, unedited.

CONTINUATION OF SF 30 BLOCK 14 AMENDMENT DESCRIPTION 0002 AGAINST SOLICITATION NO. 36C24227R0008 1. This amendment answers the following vendor questions: Number of boiler vents: On M-101 (Boiler and Generator Exhaust Plan, Phase II), the new wall penetration/chase is labeled with two 14" I.D. pipes and one 12" I.D. pipe. Keynote 2 calls for a single "new 14" boiler double walled insulated vent stack," and the cutover notes describe that one vent connecting to Boiler #1 and continuing to within two feet of Boiler #2's vent, so one common 14" vent appears to serve both boilers. The solicitation description, however, refers to "two new steel boiler exhaust stacks." Please confirm whether the work is: (a) one 14" double-wall vent common to Boiler #1 and Boiler #2, plus the 12" generator exhaust, or (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. If (a), please confirm what the second 14" pipe shown at the penetration represents. Answer: Confirming: it is (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. b) Draft control or stack fan: No stack fan, draft inducer, or boiler-outlet draft control appears on the drawings. Section 23 51 00 (paragraph 2.2, Boiler Outlet Dampers and Accessories) refers to automatic draft control specified in Section 23 09 11, but Section 23 09 11 is not included in the solicitation. Please confirm whether: (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required), or (b) a mechanical draft fan and/or barometric or motorized draft control is expected. If so, please issue Section 23 09 11 or identify the required equipment and control sequence. Answer: Confirming: it is (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required). c) Design heating load and operating water temperatures: Please provide the building design heating load (or recent gas and oil usage or meter data), and the normal heating-water supply and return temperatures for the two existing Fulton Vantage boilers. Return-water temperature sets the flue-gas temperature, which governs the vent sizing and draft calculation. Please also confirm whether the two boilers operate as lead/standby (N+1) or are both required at design load. Answer: Replacing the boiler is not part of the contract. Boilers have inducer fans. There is no stack fan or boiler draft controls to be installed. d) Facility designation: Please confirm whether the Rome CBOC is designated mission-critical under VA Physical Security and Resiliency Design requirements, or otherwise required to keep heating on during a utility outage, as this affects the vent design for both fuels. Answer: Rome CBOC is NOT designated as a Critical/Mission Critical facility. CBOCs are generally outpatient facilities rather than hospitals with inpatient, emergency, surgical, or continuity-of-government functions. Therefore, absent a specific VA risk assessment or designation, the Rome CBOC would not ordinarily be assumed to be mission critical. e) Fuel oil and emergency power: Boiler #2 fires #2 fuel oil as a backup fuel. Please confirm (a) whether the vent must be designed for oil firing on Boiler #2 (and on Boiler #1, if applicable), (b) the size and required reserve of the existing #2 oil tank, and (c) whether the boilers and their associated vent or draft equipment are served by emergency power through an automatic transfer switch. Answer: The specified vent material (AL-29-4C) is compatible for operating the boilers on natural gas or #2 oil. This contract does not include altering the existing fuel oil tank, day tank, the boilers, or the generator. We are eliminating the existing exhaust stack and installing a new exhaust stack in a different location to serve the two existing boilers and existing emergency generator. All other terms and conditions remain unchanged.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationOctober 13, 2026October 28, 2026, 10:00 AM ET
SolicitationNovember 1, 2026November 30, 2026, 10:00 AM ET
SolicitationNovember 1, 2026December 2, 2026, 10:00 AM ET
SolicitationNovember 15, 2026December 2, 2026, 10:00 AM ET
SolicitationNovember 15, 2026December 2, 2026, 10:00 AM ET
SolicitationNovember 19, 2026December 2, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.