J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT
Open. Responses are due in 3 days, on November 30, 2026, 8:00 AM ET.
Solicitation number
36C24527Q0061
Notice type
Solicitation
Agency
VETERANS AFFAIRS, DEPARTMENT OF, 245-NETWORK CONTRACT OFFICE 5 (36C245)
Set-aside
Not listed
NAICS
561210 Facilities Support Services SBA size standard: $47M average annual receipts (SBA footnote 12)
Product or service code
J065 Maint/Repair/Rebuild of Equipment- Medical, Dental, and Veterinary Equipment and Supplies
Place of performance
Not listed
Posted
November 17, 2026
Response due
November 30, 2026, 8:00 AM ET
Who holds the work now
Largest current award in NAICS 561210 at the Department of Veterans Affairs, by dollars obligated: ALL IN SOLUTIONS LLC, current end date February 28, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 36C24527Q0061 in full and tell me what stage it's at.
Pulled by AI from 5 of 7 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.
Evaluation
best value 36C24527Q0061.docx: "A one year service contract award will be made in accordance with FAR subpart 12.203 to the best valued quote based on comparative evaluations."
Evaluation factors
Technical (Approach, Capability, Experience); Past Performance; Price 36C24527Q0061.docx: "The following factors shall be used to evaluate quotes:"
Questions due
November 30, 2026, 8am 36C24527Q0061.docx: "All questions must be submitted by 11/30/2026 @ 8am"
Site visit
November 18, 2026 36C24527Q0061.docx: "Site Visit 11/18/2026 @ 9am meeting in lobby."
Site visit
mandatory 2B Covid Ward Mechancial As-Builts pt 1.pdf, page 1: "THE BIDDING CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE CONTRACT DRAWINGS PRIOR TO BID."
Past performance
The offeror must have 3-5 years of primary experience in maintaining, repairing HVAC Systems 36C24527Q0061.docx: "The offeror must have 3-5 years of primary experience in maintaining, repairing HVAC Systems."
Past performance
3-5 years of primary experience and references as a Primary Vendor RFQ 36C24527Q0061 Questions.docx: "The addendum asks for 3-5 years of primary experience and references as a Primary Vendor, and also asks offerors to identify proposed subcontractors and the work each will perform."
Past performance
HVAC work experience in medical/clinical and food preparation environments in VA facilities and/or… RFQ 36C24527Q0061 Questions.docx: "Relevant experience includes hvac work experience in medical/clinical and food preparation environments in va facilities and/or other federal facilities. Electrical experience in federal facilities will be included in evaluation."
Past performance
1 more in the files, not shown here.
Contract type
firm-fixed-price 36C24527Q0061.docx: "The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation."
The notice text
The text below is SAM.gov's own, unedited.
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
Attachments
The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.