Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

7230--WINDOW TREATMENT

Open. Responses are due in 5 days, on December 2, 2026, 12:00 PM ET.

Solicitation number36C24627Q0113
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Set-asideNot listed
NAICS337920 Blind and Shade Manufacturing
SBA size standard: 1,000 employees
Product or service code7230 Draperies, Awnings, and Shades
Place of performanceNot listed
PostedNovember 24, 2026
Response dueDecember 2, 2026, 12:00 PM ET

Who holds the work now

Largest current award in NAICS 337920 at the Department of Veterans Affairs, by dollars obligated: ZONAESTILO, LLC, current end date December 31, 2026. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C24627Q0113 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 5 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationbest value
36C24627Q0113_1.docx: "based on a best value determination considering technical capability, past performance and price."
Evaluation factorsFactor 1 Technical Capability; Factor 2 Past Performance; Factor 3 Price
36C24627Q0113_1.docx: "Factor 1 Technical Capability"
Questions dueNovember 20, 2026, 11:00 a.m. EDT
36C24627Q0113_1.docx: "Questions pertaining to this solicitation shall be emailed to Ruth Morris at ruth.morris@va.gov by November 20, 2026 at 11:00 a.m. EDT."
Past performanceAt least five years of healthcare interior design/furniture installation and project management exp…
36C24627Q0113 0003.docx: "The solicitation requires at least five years of healthcare interior design/furniture installation and project management experience, as well as three Federal projects valued at $750,000 or more."
Past performanceEach of the three Federal projects must be valued at $750,000; similar facility installations quali…
36C24627Q0113 0003.docx: "Response: Must be valued at $750,000 and similar facility installations qualify."
Past performanceMinimum 5 years of furniture installation and project management experience within healthcare inter…
36C24627Q0113_1.docx: "The contracting firm shall have a minimum of 5 years’ worth of experience of furniture installation and project management within healthcare interior design."
Past performance1 more in the files, not shown here.
Contract typefirm-fixed-price
36C24627Q0113_1.docx: "This is a Firm Fixed Price Contract for Brand Name or Equal"

The notice text

The text below is SAM.gov's own, unedited.

Amendment 36C24627Q0113 (P00003) Window Fabric Treatment Questions (Black) / Response (Red) 1. Scope and Quantities The window schedule identifies 96 windows across Pods A, B, C, and D. Amendment 0001 states that the valances will also need fabric. Could the Government confirm whether the 96 scheduled windows represent the complete quantity, and whether valance fabric is included in these quantities or should be priced separately? Response: Valance fabric was included as a full unit to the window. 96 windows = 96 valences. 2. Existing WebbLok Hardware Amendment 0001 indicates that existing WebbLok tracks, brackets, tubes, operators, and valances appear to be in place, except for one missing track in Room S136 Recreation. Could the Government confirm which existing hardware components are expected to be reused and whether the contractor is responsible for replacing the missing track? Response: S136 is not part of this contract. 3. Site Access and Measurements Is there an opportunity for prospective quoters or their proposed installation partners to conduct a pre-award site visit and field measurements? If not, could the Government confirm whether measurements and verification will be permitted immediately after award and before materials are ordered? Response: The measurements is provided in the original solicitation. Government confirms that they will be able to measure prior to ordering as that is listed in the SOW. 4. Installation Phasing and Schedule Could the Government provide an anticipated installation timeframe or expected sequence for Pods A, B, C, and D? Are there any anticipated restrictions on the number of Pods or rooms that may be worked on simultaneously? Response: Installation timeframe is dependent upon the lead time of the fabric offered. Restrictions would include working past 5PM in occupied pods, however, the VA asks to complete rooms all the way through to ensure complete activation (ie: no removing all the blind fabrics and not being able to put it back up by end of day.) 5. Project Experience Requirements The solicitation requires at least five years of healthcare interior design/furniture installation and project management experience, as well as three Federal projects valued at $750,000 or more. Could the Government clarify whether the experience and past-performance qualifications of a proposed subcontractor or installation partner may be considered in satisfying these requirements when the prime contractor is responsible for project management and contract administration? Response: That will qualify. 6. Past Performance Could the Government clarify whether the three Federal projects referenced in the experience requirement must each be valued at $750,000 or more, and whether projects involving window treatment installation or similar healthcare facility interior installations may qualify? Response: Must be valued at $750,000 and similar facility installations qualify. 7. Pricing and Installation The price schedule separates material and installation services by Pod. Could the Government confirm whether installation pricing should include removal and disposal of existing shade fabric, fabric installation on valances, field measurements, project management, training of VA maintenance personnel, cleanup, and punch-list trips Response: Correct, pricing should include installation, measurements, project management, clean-up, and punch list. 8. Product Specification Is the specified Inpro WT Commercial Shade Fabric 25X, 251-10 the required product, or may a technically equivalent product meeting all specified characteristics be offered? If an equivalent product is proposed, could the Government confirm the sample submission process and whether the sample deadline is calculated from the original quotation deadline or the date of actual quote submission? Response: This is addressed in the submission. It is an or equal contract.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationNovember 5, 2026November 17, 2026, 11:00 AM ET
SolicitationNovember 16, 2026November 25, 2026, 11:00 AM ET
SolicitationNovember 16, 2026November 16, 2026, 11:00 AM ET
SolicitationNovember 23, 2026December 2, 2026, 11:00 AM ET
SolicitationNovember 23, 2026November 25, 2026, 11:00 AM ET
SolicitationNovember 24, 2026December 2, 2026, 12:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.