Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Presolicitation

Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206

Open. Responses are due in 3 days, on November 30, 2026, 3:00 PM ET.

Solicitation number36C25027B0008
Notice typePresolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 250-NETWORK CONTRACT OFFICE 10 (36C250)
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
NAICS236220 Commercial and Institutional Building Construction
SBA size standard: $45M average annual receipts
Product or service codeZ1DA Maintenance of Hospitals and Infirmaries
Place of performanceNot listed
PostedNovember 7, 2026
Response dueNovember 30, 2026, 3:00 PM ET

Who holds the work now

Largest current award in NAICS 236220 at the Department of Veterans Affairs, by dollars obligated: WALSH CONSTRUCTION COMPANY II, LLC, current end date March 25, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C25027B0008 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

The notice text

The text below is SAM.gov's own, unedited.

CONSTRUCTION STATEMENT OF WORK Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.

What SAM.gov has posted, oldest first

NoticePostedResponse due
PresolicitationNovember 7, 2026November 30, 2026, 3:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.